North Stanmore Drilling Update
Released
Released
Announcement PDF
ASX RELEASE
19 September 2024
North Stanmore Drilling Update
Victory Metals Limited (ASX: VTM) is pleased provide an update on its current Aircore (“AC”) drill
program at the Company’s 100% owned North Stanmore Heavy Rare Earth and Critical Defence
Metal Project. To date, over 2,239m have been successfully completed in the current drill program.
Key Highlights:
•
Portable x-ray fluorescence (“P-XRF”) Heavy Rare Earth Yttrium analyses recorded in clay
regolith 2.6km south of the existing Mineral Resource Estimate (“MRE”) area (see
Appendix 1 and 2)
•
These positive Yttrium analyses are a useful HREE vector that show the potential
extension of rare earth mineralisation defined in the MRE.
The Company cautions that P-XRF analyses should never be considered a proxy or
substitution for laboratory analyses where concentrations or grades are the factor
principal economic interest. P-XRF analyses also potentially provide no information
regarding impurities or deleterious physical properties relevant to valuations.
•
Shallow clay horizons consistent with previous drilling analyses have also been identified
in this latest drilling program (see Appendix 1 and 2)
•
Drilling to the south of the MRE is now complete with drilling focused and commenced
9km to the north of the MRE area
•
QA/QC data assessed during preparation of the MRE confirmed that P-XRF analyses
provided reliable vectors to discriminate HREE mineralised zones that were subsequently
confirmed by ICPMS analytical results
Victory’s CEO and Executive Director Brendan Clark, commented:
“The positive XRF analyses 2.6km south of our existing MRE indicate the potential for mineralisation
beyond what we have already identified and provides an exciting opportunity for resource
expansion."
“Drilling has now commenced 9km north of the current MRE. Shallow saprolitic clay horizons similar
to those observed in previous drilling campaigns have been identified, supporting the prospect of
further rare earth element (REE) mineralisation. This drilling program is part of the Company's
ongoing strategy to expand its resource base and strengthen its position as a leader in the heavy
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
rare earths sector globally and an important producer of critical defence metals such as Scandium
(Sc) and Hafnium (Hf).”
Figure 1: North Stanmore Project overview showing the location of the positive P-XRF analyses.
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
QA/QC data assessed during preparation of the MRE has previously suggested that P-XRF analyses
provided reliable vectors to discriminate HREE mineralised zones that were subsequently confirmed
by ICPMS analytical results. Drilling samples are being prepared and sent for laboratory analysis,
with assays expected to be received within approximately 6-8 weeks of this Announcement.
Proposed Issue of Performance Rights
The Company has agreed, subject to obtaining all necessary shareholder approvals (including Listing
Rule 10.14), to issue the following Class 1, Class 2 and Class 3 Performance Rights under the
Company’s Employee Securities Incentive Plan (ESIP) to the Directors and Consultants of the
Company.
Class 1 - Milestone: Market Capitalisation of $75 million
•
•
•
•
Brendan Clark – CEO & Executive Director
James Bahen – Non-Executive Chairman
Professor Ken Collerson – Technical Director
Consultants
750,000 performance rights
500,000 performance rights
400,000 performance rights
583,333 performance rights
Class 2 - Milestone: Market Capitalisation of $125 million
•
•
•
•
750,000 performance rights
500,000 performance rights
400,000 performance rights
583,333 performance rights
Brendan Clark – CEO & Executive Director
James Bahen – Non-Executive Chairman
Professor Ken Collerson – Technical Director
Consultants
Class 3 - Milestone: Market Capitalisation of $150 million
•
•
•
•
Brendan Clark – CEO & Executive Director
James Bahen – Non-Executive Chairman
Professor Ken Collerson – Technical Director
Consultants
750,000 performance rights
500,000 performance rights
400,000 performance rights
583,334 performance rights
Full details of the Performance Right terms and conditions will be included in the Company’s
Notice of Annual General Meeting, with the meeting scheduled to be held on 14 November 2024.
This announcement has been authorised by the Board of Victory Metals Limited.
For further information please contact:
Brendan Clark
CEO and Executive Director
b.clark@victorymetalsaustralia.com
Jane Morgan
Investor and Media Relations
jm@janemorganmanagement.com.au
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
Victory Metals Limited
Victory is focused upon the exploration and development of its Heavy Rare Earth Element (REE) and
critical mineral Discovery in the Cue Region of Western Australia. Victory’s key assets include a
portfolio of assets located in the Midwest region of Western Australia, approximately 665 km from
Perth. Victory’s clay REE discovery is rapidly evolving with the system demonstrating high ratios of
Heavy Rare Earth Oxides and Critical Magnet Metals NdPr + DyTb.
Competent Person Statements - Professor Ken Collerson
Statements contained in this report relating to exploration results, Mineral Resource Estimate,
scientific evaluation, and potential, are based on information compiled and evaluated by Professor
Ken Collerson. Professor Collerson (PhD) Principal of KDC Consulting and Director of Victory Metals
Limited, and a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM No. 100125),
is a geochemist/geologist with sufficient relevant experience in relation to rare earth element and
critical metal mineralisation being reported on, to qualify as a Competent Person as defined in the
Australian Code for Reporting of Identified Mineral resources and Ore reserves (JORC Code 2012).
Professor Collerson consents to the use of this information in this report in the form and context in
which it appears.
Appendix 1 Hole ID and Collars
HOLE_ID
AC0001
AC0002
AC0003
AC0004
AC0005
AC010
EASTING NORTHING
588310
6970310
588510
6970310
588710
6970310
588910
6970310
589110
6970310
588500
6971370
RL
432
432
432
432
432
432
DIP °
-90
-90
-90
-90
-90
-90
Depth
52
48
50
19
43
60
Appendix 2 Summary of Anomalous AC Holes
Hole No.
Interval
Y ppm
AC0001 Anomaly
AC0001 REE Background
10 m
54 m
Mean 39
Mean 21
36 m
63 ppm
Mean 39
AC0001 Maximum Y Concentration
AC0002 REE Anomaly
AC0002 Background
AC0002 Maximum Y Concentration
37 m
Mean 23
53 ppm
AC0003 REE Anomaly
AC0003 Background
AC0003 Maximum Y Concentration
AC0005 REE Anomaly
AC0005 Background
AC0005 Maximum Y Concentration
AC010 REE Anomaly
AC010 Background
AC010 Maximum Y Concentration
16 m
25 m
Mean 40
Mean 23
89 ppm
Mean 62
Mean 25
128 ppm
Mean 81
Mean 25
196 ppm
7m
24 m
7m
7m
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Sampling techniques
•
•
Commentary
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
•
•
Aspects of the determination of mineralisation
that are Material to the Public Report.
•
In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
•
•
Victory Metals Australia (ASX:VTM) commenced an approximate
5,000m air core (AC) drilling program in September 2024.
Drilling samples from the drilling program were collected as 1-m
samples from the rig cyclone and placed in pre numbered green
plastic sample bag
The samples are logged, and split using a three tier riffle splitter to
collect approximately 1.25kg sample in a separate labeled calico
The calico sample bags are secured in bulka bags and transported by
road to Victory’s sampling warehouse in Burswood
• A handheld pXRF analyzer (Olympus Vanta) in a workstation was used
to determine anomalous REE (Rare earth element) geochemistry using
Yttrium as a vector from the 1-m sample
• pXRF reading times were 15 secs over 3 cycles for multielement and
REE assays
• These results are not considered reliable without calibration using
chemical analysis from an accredited laboratory. However their
integrity was checked using Certified REE-bearing geochemical
standards
• The pXRF is a powerful guide to the presence or absence of REEs
elements (La, Ce, Nd and Y) to help direct the sampling program
• Anomalous 1m samples are then transported to the assay lab for
analysis
• REE anomalism thresholds are determined by VTM technical lead
based on historical data analysis
Drilling techniques
•
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
•
(AC) drilling uses a three bladed steel or tungsten drill bit to penetrate
the weathered layer of loose soil and rock fragments. The drill rods are
hollow and feature an inner tube with an outer barrel (similar to RC
drilling).
•
(AC) drilling uses small compressors (750 cfm/250 psi) to drill holes
into the weathered layer of loose soil and fragments of rock.
•
After drilling is complete, an injection of compressed air is unleashed
JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
into the space between the inner tube and the drill rod’s inside wall,
which flushes the cuttings up and out of the drill hole through the
rod’s inner tube, causing Less chance of cross-contamination.
Drill sample recovery
(AC) drill rigs are lighter in weight than other rigs, meaning they’re
quicker and more maneuverable in the bush
•
(AC) Drilling is being performed by Orlando Drilling from Perth
•
Representative (AC) samples were collected as 1-meter intervals, with
corresponding chips placed into chip trays and kept for reference at
VTM’s facilities
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
•
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
•
Most samples were dry and sample recovery was very good
•
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse grained material.
VTM does not anticipate any sample bias from loss/gain of material
from the cyclone
•
No defined relationship exists between sample recovery and grade.
Sample bias due to preferential loss or gain of fine or coarse material
has not been noted
•
VTM does not anticipate any sample bias from loss/gain of material
from the cyclone
•
All (AC) samples were lithologically logged using standard industry
logging software on a notebook computer
All (AC) samples have been logged for lithology, alteration, quartz veins,
colour, fabrics
Representative (AC) samples collected as 1-meter intervals, with
corresponding chips placed into chip trays and kept for reference at
VTM’s facilities
•
Logging
•
•
•
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
•
•
•
Field logging is qualitative in nature
JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
•
Sub-sampling techniques
and sample preparation
Quality of assay data and
laboratory tests
The total length and percentage of the relevant
intersections logged.
•
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
•
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
•
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
•
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
•
Whether sample sizes are appropriate to the
grain size of the material being sampled.
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
•
For geophysical tools, spectrometers, handheld
Commentary
•
Controlled logging is being undertaken at Victory’s sampling
warehouse in Burswood
•
(AC) samples in chip trays have been photographed
•
All geological information noted above has been completed by a
competent person as recognised by JORC
•
Air core sampling was undertaken on 1m intervals
•
Most 1-meter samples were dry and weighed between 7 and 10 kg
•
Samples from the cyclone were collected in pre numbered sample
green plastic bags
•
Quality control of the assaying comprised the collection of a duplicate
sample every hole, along with the regular insertion of industry (OREAS)
standards (certified reference material) every 20 samples and blanks
every 40 samples
•
Samples to be submitted for sample preparation and geochemical
analysis by ALS Perth
JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Commentary
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Verification of sampling
and assaying
Location of data points
•
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
•
The verification of significant intersections by
either independent or alternative company
personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
Verification of significant intersection was undertaken by Victory’s
technical director Prof Kenneth Collerson (PhD, FAusIMM)
•
ALS labs routinely re-assayed anomalous assays as part of their
normal QAQC procedures.
•
All (AC) drill hole coordinates are in GDA94 Zone 50
•
All (AC) holes were located by handheld GPS with an accuracy of +/5m
•
There is no detailed documentation regarding the accuracy of the
topographic control
•
Elevation values (Z) were recorded for collars
•
There were no Down-hole surveys completed as (AC) drill holes were
not drilled deep enough to warrant downhole surveying
JORC Code, 2012 Edition – Table 1
Criteria
JORC Code explanation
Data spacing and
distribution
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
•
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
•
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling
bias, this should be assessed and reported if
material.
Orientation of data in
relation to geological
structure
Commentary
•
(AC) drilling at North Stanmore drill program was designed by MEC
mining consultants West Perth with variable distances between holes
and line spacing.
•
The relationship between drill orientation and the mineralised
structures is not known at this stage as the prospects are covered by a
2-10m blanket of transported cover
•
It is concluded from aerial magnetics that any mineralisation trends
010-030. Dips are unknown as the area is covered by a thin (1-5m)
blanket of transported cover
•
Azimuths and dips of (AC) drilling was aimed to intersect the strike of
the rocks at right angles
•
Downhole widths of mineralisation are not accurately known with (AC)
drilling methods
Sample security
•
The measures taken to ensure sample security.
•
All samples packaged and managed by VTM personnel
Audits or reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
No sampling techniques or data have been independently audited
Criteria
JORC Code explanation
Mineral tenement and land
tenure status
•
•
Exploration done by other
parties
Geology
•
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Acknowledgment and appraisal of exploration by
other parties.
Deposit type, geological setting and style of
mineralisation.
Commentary
•
North Stanmore Exploration Targets are located within E 20/871, M
20/550, M 20/546, E 20/1016 & E 20,971
•
They form part of a broader tenement package of exploration
tenements located in the Cue Goldfields in the Murchison region of
Western Australia.
•
Native Title claim no. WC2004/010 (Wajarri Yamatji #1) was registered
by the Yaatji Marlpa Aboriginal Corp in 2004 and covers the entire
project area, including Coodardy and Emily Wells.
E 20/871, M 20/550, M 20/546, E 20/1016 & E 20,971 is held 100% by
Victory Metals. All tenements are secured by the DMIRS (WA
Government). All tenements are granted, in a state of good standing
and have no impediments
•
•
The area has been previously explored by Harmony Gold (2007-2010)
in JV with Big Bell Ops, Mt Kersey (1994-1996) and Westgold (2011) and
Metals Ex (2013)
•
Exploration by this company has been piecemeal and not regionally
systematic
•
There has been no historical exploration for REEs in the tenement
•
Both areas, lie within the Meekatharra – Mount Magnet greenstone
belt. The belt comprises metamorphosed volcanic, sedimentary and
intrusive rocks. Mafic and ultramafic sills are abundant in all areas of
the Cue greenstones. Gabbro sills are often differentiated with basal
pyroxenite and/or peridotite and upper leucogabbric units.
•
The greenstones are deformed by large scale fold structures which are
dissected by major faults and shear zones which can be mineralised.
Two large suites of granitoids intrude the greenstone belts.
•
The productive gold deposits in the region can be classified into six
categories:
•
Shear zones and/or quartz veins within units of alternating banded iron
formation and mafic volcanics e.g. Tuckanarra and Break of Day
•
Shear zones and/or quartz veins within mafic or ultramafic rocks,
locally intruded by felsic porphyry e.g., Cuddingwarra. Great Fingall
•
Banded jaspilite and associated clastic sedimentary rocks and mafics,
generally sheared and veined by quartz, e.g. Tuckabianna
Criteria
Drill hole Information
Data aggregation methods
JORC Code explanation
•
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
•
easting and northing of the drill hole collar
•
elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
•
dip and azimuth of the hole
•
down hole length and interception depth
•
hole length.
•
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
•
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
Commentary
•
Quartz veins in granitic rocks, close to greenstone contacts, e.g.
Buttercup
•
Hydrothermally altered clastic sedimentary rocks, e.g. Big Bell
•
Eluvial and colluvial deposits e.g. Lake Austin, Mainland
•
A post tectonic differentiated alkaline mafic to ultramafic intrusion
(North Stanmore Intrusion) cuts the Archaean greenstone belt
lithologies
•
The documentation for completed drill hole locations at the North
Stanmore are located in Appendix 1 of this announcement and is
considered acceptable by VTM
•
Consequently, the use of any data obtained is suitable for
presentation and analysis
•
The exploration results are considered indicative and material to the
reader
•
NA
Criteria
JORC Code explanation
Commentary
and should be stated.
•
Where aggregate intercepts incorporate short
lengths of high- grade results and longer lengths
of low- grade results, the procedure used for
such aggregation should be stated and some
typical examples of such aggregations should be
shown in detail.
•
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
•
These relationships are particularly important in
the reporting of Exploration Results.
•
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
•
If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (eg ‘down hole length, true width
not known’).
Diagrams
•
Balanced reporting
•
Relationship between
mineralisation widths and
intercept lengths
•
NA
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view
of drill hole collar locations and appropriate
sectional views.
•
Diagrams are used in the compilation of the (AC) drilling plans and
sections for North Stanmore. Also used to show distribution of drill hole
geochemistry
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
•
Exploration results that may create biased reporting has been omitted
from these documents
•
Data received for this announcement is located in:
•
Appendix 1 – (AC) drill hole collar coordinates and specifications.
Criteria
JORC Code explanation
Other substantive
exploration data
•
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Further work
•
The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions
or large-scale step-out drilling).
•
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
•
NA
•
NA
Share your feedback