DISCLAIMER
Not a disclosure documentThe purpose of this presentation is to provide
general information about the Company only. This presentation is not a
disclosure document for the purpose of Chapter 6D of the Corporations
Act 2001 (Cth) (Corporations Act) and does not purport to include the
information required of such a disclosure document. It has not been
lodged with or approved by any regulatory authority, such as the Australian
Securities and Investments Commission or the Australian Securities Exchange.
No New Information or DataThis document contains exploration results
and historic exploration results as originally reported in fuller context in
Victory Metals Ltd ASX Announcements as published on the Company’s
website. Victory confirms that it is not aware of any new information or
data that materially affects the information included in the relevant market
announcements. In the case of Mineral Resource estimates, Ore Reserve
estimates, production targets and forecast financial information derived from
the production targets, all material assumptions and technical parameters
underpinning the estimates, production targets and forecast financial
information derived from the production targets contained in the relevant
market announcement continue to apply and have not materially changed
in the knowledge of Victory. The recent Company ASX new releases referred
to in this presentation include:
•
“Amended - WORLD CLASS RATIOS OF Dy & Tb 8.8KM FROM MRE”
dated 12 February 2024
•
“NORTH STANMORE ASCENDS AS PROMINENT HEAVY RARE EARTH
PROJECT” dated 6 February 2024
•
“HIGH VALUE MIXED RARE EARTH CARBONATE PRODUCTED”
dated 6 November 2023
•
“NORTH STANMORE INITIAL MINERAL RESOURCE ESTIMATE”
dated 2nd August 2023
•
“FOLLOW UP METALLURGICAL TESTWORK PROVIDES EXCELLENT
RARE EARTH MAGNET METAL RECOVERIES” dated 13th June 2023
•
“RC DRILLING ASSAYS COMPLETED WITH HIGH CONTENT OF
HEAVY REE” dated 15 May 2023
•
“EXCEPTIONAL RECOVERIES OF CRITICAL HEAVY RARE EARTH
ELEMENTS” dated 1 May 2023
•
”RC Drilling Confirms HREE Mineralisation” dated 17 April 2023
•
“VICTORY EXPANDS RARE EARTH ELEMENT EXPLORATION AREA”
dated 6 April 2023
ASX:VTM
•
“Rare Earth Element Footprint Confirmed” dated 13 March 2023
RELIANCE ON PRESENTATION
•
“MAJOR INFILL AND EXPLORATION DRILL PROGRAM COMMENCED”
dated 12th September 2023
A recipient of this presentation must make their own assessment of the
matters contained herein and rely on their own investigations and judgment
in making an investment in the Company. This presentation does not purport
to contain all of the information a recipient of this presentation requires to
make an informed decision whether to invest in the Company. Specifically,
this presentation does not purport to contain all the information that
investors and their professional advisers would reasonably require to make
an informed assessment of the Company’s assets and liabilities, financial
position and performance, profits, losses and prospects.
NO OTHER MATERIAL AUTHORISED
The Company has not authorised any person to give any information or
make any representation in connection with any proposed offer of securities.
A prospective investor cannot rely upon any information or representations
not contained in this presentation.
NATURE OF MINERAL EXPLORATION RISKS
This presentation does not purport to be all-inclusive or to contain all
the information that you or any other party may require to evaluate the
prospects of the Company. The mineral tenements of the Company as
described in this presentation are at various stages of exploration, and
potential investors should understand that mineral exploration and
development are high-risk undertakings.
Some of the tenements are in the application stage only and there is no
guarantee the applications will be granted by the responsible minister or
governmental decision maker having jurisdiction. There can be no assurance
that exploration of the tenements, or any other tenements that may be
acquired in the future, will result in the discovery of an economic ore
deposit. Even if an apparently viable deposit is identified, there is no
guarantee that it can be economically exploited.
FORWARD-LOOKING STATEMENTS
This announcement contains “forward-looking statements”. All statements
other than those of historical facts included in this announcement are forward
looking statements. Where a company expresses or implies an expectation
or belief as to future events or results, such expectation or belief is expressed
in good faith and believed to have a reasonable basis. However, forwardlooking statements re subject to risks, uncertainties and other factors,
which could cause actual results to differ materially from future results
expressed, projected or implied by such forward-looking statements.
Such risks include, but are not limited to, metals price volatility, currency
fluctuations, increased production costs and variances in ore grade or
recovery rates from those assumed in mining plans, as well as political
and operational risks and governmental regulation and judicialoutcomes.
Neither company undertakes any obligation to release publicly any revisions
to any “forward-looking” statement.
NOT A RECOMMENDATION OR FINANCIAL ADVICE
The information in this presentation is not a recommendation to subscribe for
securities in the Company and does not constitute financial advice. Any person
who intends to subscribe for securities must conduct their own investigations,
assessment and analysis of the Company and its operations and prospects
and must base their investment decision solely on those investigations and
that assessment and analysis. Prospective investors should consult their own
legal, accounting and financial advisers about an investment in the Company.
COMPETENT PERSON STATEMENT
Professor Ken CollersonStatements contained in this report relating to
exploration results, scientific evaluation, and potential, are based on
information compiled and evaluated by Professor Ken Collerson. Professor
Collerson, BSc (Hons.), PhD is Principal of KDC Geo Consulting, and a Fellow
of the Australasian Institute of Mining and Metallurgy (AusIMM), membership
number #100125. He is a geochemist and geologist membership number
#100125. He is a is a geochemist/geologist with sufficient relevant experience
in relation to rare earth element geochemistry, critical metal mineralisation
and REE systematics given in Core metallurgical data summaries being
reported on, to qualify as a Competent Person as defined in the Australian
Code for Reporting of Identified Mineral resources and Ore reserves
(JORC Code 2012). Professor Collerson consents to the use of this information
in this report in the form and context in which it appears.
www.victorymetalsaustralia.com
AUSTRALIA’S LARGEST
130,000 TONNES
VERY HIGH PERCENTAGES
Heavy Rare Earth (HREO)
of Total Rare Earth
of critical Rare Earth
enriched ionic/regolith
Oxide (TREO) from 18%
Elements Dysprosium (Dy)
clay deposit
of the drilled area
and Terbium (Tb)
Mixed Rare Earth
Carbonate Test Product
250 MT JORC RESOURCE
A$116,000 PER TONNE
Inferred Mineral
BASKET PRICE
Resource Estimate
Victory hosts a premium
96.4% VALUABLE
700Mt - 1000Mt
basket of REE with an
HEAVY REE in Mixed
Exploration Target
estimated basket
Rare Earth Carbonate
A$116 per kg
Test Product
WHY VICTORY METALS
NORTH STANMORE RARE EARTH ELEMENT PROJECT
ASX:VTM
www.victorymetalsaustralia.com
North Stanmore is
Infill drill program
LOW LEACH TIMES
100% OWNED with
RECENTLY COMPLETED
with economic acid
outstanding logistical and
WITH 60% ASSAYS
consumption and
location advantages
RECEIVED. Designed to
low levels of gangue
increase grade, size and
materials and impurities
VERY LOW CONTENTS OF
RADIOACTIVE ELEMENTS
confidence in the MRE and
to facilitate a project study
Beneficiation test
work shows rare earth
Uranium (and Thorium)
assists with the
NORTH STANMORE A
element feed grades
economics of the project
UNIQUE HEAVY RARE EARTH
CAN BE INCREASED
PROJECT Due to multiple
UP TO 148%
tropical weathering events
experienced by the ~ 2
CONTINUED...
ASX:VTM
billion year old alkaline
source intrusion
www.victorymetalsaustralia.com
WORLD CLASS RATIOS OF DYSPROSIUM
& TERBIUM 8.8KM FROM MINERAL
RESOURCE ESTIMATE
INFILL MRE DRILL ASSAY UPDATE
7.75% Dysprosium (Dy) and Terbium (Tb) ratios of TREO mineralisation
intersected approximately 8.8km north and outside the existing mineral
resource estimate (MRE)
These latest assays extends Victory’s exploration zone by approx 51km² giving
North Stanmore potential to become one of the largest Heavy Rare Earth
regolith ionic-clay hosted Projects in the world
Up to 348ppm of (Dy2O3) and (Tb) (Tb4O7) confirmed from Victory’s latest infill
resource definition drilling program within the MRE area
Over 60% of assay results now received from 81 AC drill holes from Victory’s
latest infill drilling program which continues to confirm wide intersections
and TREO grades of up to 9986ppm.
TREO average grade from 81 holes received to date is 1072ppm
ASX:VTM
North Stanmore tenement package and pending tenements,
with the MRE and future exploration target zones highlighted.
www.victorymetalsaustralia.com
INITIAL MINERAL
RESOURCE ESTIMATE
NORTH STANMORE
Initial Inferred Mineral Resource of 250Mt at 520ppm
MRE area is only 18% of Exploration Target Area
Exploration Target 700Mt to 1,100Mt
130,000t of contained Total Rare Earth Oxide (TREO)
Substantial (33%) heavy rare earth oxide (HREO/TREO)
54% critical metals as identified by the US Government 2022
Drill assays averaging 828ppm of TREO (400ppm cut off)
ASX:VTM
Nort h St a nmore t enement pa cka ge a nd pending t enement s,
wit h t he MR E a nd explora t ion t a rget a rea s highlight ed.
www.victorymetalsaustralia.com
―――
NOT ALL RARE EARTH ELEMENTS ARE RARE,
LIGHT RARE EARTHS CERIUM AND LANTHANUM
ARE LOW VALUE AND IN ABUNDANT SUPPLY
WITH A COMBINED PRICE OF A$3.80kg
―――
HEAVY RARE EARTHS DYSPROSIUM AND TERBIUM
HAVE A COMBINED PRICE OF A$3,200kg
V I C T O R Y
M E T A L S
―――
INDICATIVE
BASKET PRICE
ASSUMPTIONS
NORTH STANMORE
Basket Price US$/kg REO
100
80
60
40
20
0
VTM
IXR
SOURCE: Refer to ASX:IXR announcement dated 2nd October 2023.
SOURCE: https://wcsecure.weblink.com.au/pdf/IXR/02645488.pdf
SOURCE: https://wcsecure.weblink.com.au/pdf/MEI/02689203.pdf
ASX:VTM
MEI
•
•
•
SOURCE: https://www.statista.com/statistics/450164/global-reo-dysprosium-oxide-price-forecast/
SOURCE: https://www.statista.com/statistics/450163/global-reo-terbium-oxide-price-forecast/
SOURCE: https://www.statista.com/statistics/449838/forecast-average-rare-earth-oxide-prices-globally/
SOURCE: https://www.asianmetal.com/Erbium/ | SOURCE: Argus Rare Earths monthly outlook 7 June 2023.
COMPARISONS ARE BASED FROM MARKET LEADING PEERS
IN THE RARE EARTH ELEMENT SECTOR WITH JORC MRE
4
20
NdPr (%)
DyTb (%)
3
2
10
1
0
3000
0
VTM
IXR
MEI
Eraser Institute 2022
Investment Attractiveness Index (%)
1000
TREYO
TREYO
La
La
VTM
IXR
0
La
MEI
Inferred Resource Mt
2000
400
200
0
IXR
MEI
80
600
TREYO
TREYO Resource (ppm)
VTM
18% of
Expl.
Target
VTM
IXR
MEI
W.A.
60
Brazil
40
Africa
20
0
VTM
IXR
MEI
SOURCE: https://wcsecure.weblink.com.au/pdf/IXR/02653808.pdf | SOURCE: https://wcsecure.weblink.com.au/pdf/IXR/02645488.pdf | SOURCE: https://wcsecure.weblink.com.au/pdf/MEI/02689203.pdf | SOURCE: https://wcsecure.weblink.com.au/pdf/MEI/02660657.pdf
ASX:VTM
R
A
D
I
O
A
C
T
I
V
I
T
Y
VTM
IXR
MEI
VTM
IXR
MEI
Th (ppm)
PEER COMPARISONS
VTM HOSTS INDUSTRY LOW LEVELS
OF URANIUM AND THORIUM
LOW COST RECOVERY
ACHIEVED & HIGH RATIOS
OF DYSPROSIUM & TERBIUM
Figure 1
VICTORY NORTH
STANMORE
Pr6O11
4.4%
Nd2O3
12.1%
Tb4O7
9.9%
Results of metallurgical testwork on a representative set of 23 samples from Heavy Rare
Earth-Rich Ionic Clay-Regolith North Stanmore Project confirms low-cost Rare Earth
Element (REE) extraction with forecast key unit operating costs;
• Sulphuric Acid (H2SO4) consumption rate averages 25kg/t equivalent to $5.77/t
• Forecast reagent cost for removal of gangue aluminium averages $4.32/t
Dy2O3
73.6%
Figure 2
SERRA VERDE
PELA EMA
• Forecast reagent cost for removal of gangue iron averages $2.64/t
Low levels of deleterious radioactive elements Uranium (U) & Thorium (Th) facilitates
simple processing and product transport management resulting in reduced OPEX
Dy2O3
9.36%
Pr6O11
20.9%
Nd2O3
Figure 1 compares that relative proportions of the magnet REE (MREEs), NdPr and DyTb in the two metallurgical products that have been produced to date by Victory
from its North Stanmore Project and Serra Verde Pesquisa e Mineração from their Pela Ema Project in Goias, Brazil[1].
Victory’s mixed HREE optimised REE carbonate product contains outstanding proportions of Dy and Tb (Dy 73.6% and Tb 10%) [2] that are significantly higher (Dy
73.6% and Tb 10%) than in the mixed REE concentrate reported by Serra Verde from the Pela Ema Project (Dy 9.4% and Tb 1.6%).
Refer to https://www.cetem.gov.br/antigo/images/palestras/2015/iiisbtr/05-denilson-fonseca.pdf.
Tb4O7
1.56%
68.2%
Light MREEs
Heavy MREEs
Nd
Dy
Pr
Tb
[1]REEs in the Serra Verde deposit are sourced from the Serra Dourada Granite an S-type granite. By contrast, the North Stanmore Deposit is located above a large compositionally variable alkaline intrusion that includes ultramafic lithologies,
gabbros, monzonites and syenites. [2] Refer to ASX announcement dated 6 Nov 2023 titled “High Value Mixed Rare Earth Carbonate Produced”
ASX:VTM
www.victorymetalsaustralia.com
NORTH STANMORE
METALLURGY
• EXCEPTIONAL YIELDS of Heavy Rare Earth Elements up to 63.6%
Lutetium (Lu), 60% Dysprosium (Dy) and 58% Terbium (Tb)
• These high recoveries were achieved with LOW TEMPERATURE
50°C and SHORT LEACHING TIME of (4 hrs)
• INCREASED MAGNET METALS NdPr + DyTb recoveries of
77.7% from follow up testwork using a sulphuric acid baking
leach with low leach time (2 hrs)
• Victory’s metallurgical approach uses ammonium sulphate and
sulphuric acid that are SIGNIFICANTLY LESS EXPENSIVE and
more READILY AVAILABLE than hydrochloric acid
ASX:VTM
www.victorymetalsaustralia.com
MIXED RARE EARTH CARBONATE (MREC)
TEST PRODUCT
• MREC test product SUCCESSFULLY PRODUCED AT
LAB SCALE from North Stanmore drilling assays
from 12 holes across North Stanmore MRE area
• Assays confirm 96.4% HEAVY RARE EARTH
OXIDE (HREO) to Total Rare Earth Oxide (TREO)
in the MREC test product
• MREC test product has a VERY HIGH TREO
CONCENTRATION of 12.46% weight (124,600ppm)
• H
‘ IGH CONTENTS OF CRITICAL METALS Nickel,
Cobalt and Copper recovered as by-products
• L
‘ OW IMPURITY LEVELS OF GANGUE MATERIALS
in MREC that were 99% removed using low cost method
ASX:VTM
VICTORY’S HIGH VALUE HEAVY RARE EARTH ENRICHED
MIXED RARE EARTH CARBONATE TEST PRODUCT
www.victorymetalsaustralia.com
BENEFICIATION HAS POTENTIAL
TO INCREASE GRADE FROM
520PPM TREE TO 1071PPM TREE
ORE
GOLD CONCENTRATE
SHALLOW
OPEN CUT MINE
Low-grade
Coarse Ore
ORE SLURRYING
Recycled Water
53 MICRON
SCREENING
Low-grade
Waste Ore
Returned to
Mine Site
ALLUVIAL GOLD
GRAVITY PROCESSING
High-grade
Fine Ore
WEAK ACID
LEACHING
FILTRATION
IMPURITY
REMOVAL
Cu RECOVERY
MREC
PRODUCTION
Ni, Co MHP
PRODUCTION
COPPER SULPHATE
CRYSTAL
MIXED RARE EARTH
CARBONATE PRODUCTION
MHP
Depleted Waste Ore
Returned to Mine Site
VICTORY METALS CONCEPTUAL FLOWSHEET
ASX:VTM
www.victorymetalsaustralia.com
RARE EARTH ELEMENT
RECOVERY PROFILES
WEAK ACID LEACH VARIABILITY TESTING
LOW ACID USE
+
LOW COST ACIDS
+
LOW LEACH TIMES
+
LOW RADIOACTIVITY
+
LOW IMPURITIES
=
EXCELLENT METALLURGY
ASX:VTM
www.victorymetalsaustralia.com
RARE EARTH ELEMENT
RECOVERY PROFILES
PEER COMPARISON OF AVERAGE WEAK
ACID LEACH HREE EXTRACTION
1
1 –As reported in Makuutu DFS -Appendix 3, 20 March 2023 | 2 –As reported in MEI ASX Release 20 December 2022
ASX:VTM
VICTORY EXTRACTED LOW LEVELS OF
IMPURITIES Fe/Al DURING RECOVERY
2
SOURCE: https://wcsecure.weblink.com.au/pdf/IXR/02645488.pdf | SOURCE: https://wcsecure.weblink.com.au/pdf/MEI/02614652.pdf
www.victorymetalsaustralia.com
LOCATION
PRIME LOCATION WITH WEATHER ADVANTAGES FOR
MINING, EXPLORATION AND POWER GENERATION
•
North Stanmore
situated alongside
Great Northern
Highway being
one of Australia’s
major arterial
road networks
connecting
the Pilbara to
the World
ASX:VTM
•
Situated
approximately
7.5km from
Cue township
and ~420km to
Geraldton Port
by sealed roads
•
Cue has a regional
airport which
is connected to
major cities by a
commercial airline
•
Westgold recently
commissioned
hybrid power
station in Cue
•
VTM has no
freehold land
owners to deal
with, land access
or resettlement
issues as 100% of
North Stanmore
is situated on
Crown Land
www.victorymetalsaustralia.com
RARE EARTH ELEMENTS
CRITICAL USES
F35 Jets
Nuclear Reactors
Semiconductors
Wind Turbines
Electric vehicles
Lasers
RARE EARTH ELEMENTS
SIX VALUABLE AND CRITICAL RARE EARTH ELEMENTS
69
59
Tm
60
Pr
Thulium
66
71
Nd Dy
Praseodymium
Neodymium
65
Lu
Dysprosium
Tb
Lutetium
Terbium
Critical Uses
Critical Uses
Critical Uses
Critical Uses
Critical Uses
Critical Uses
•
Lasers
•
Electric Vehicle
•
Electric Vehicle
•
Electric Vehicle
•
F35 Jet
•
Xray
•
Xray
•
Wind Turbine
•
Wind Turbine
•
Wind Turbine
•
Xray Machine
•
•
Semiconductor
•
Nuclear Reactor
•
MRI
High Temp
Fuel Cells
•
Semiconductor
•
Defense Laser
•
Electric Vehicle
•
Wind Turbine
•
Semiconductor
ASX:VTM
www.victorymetalsaustralia.com
―――
GEOPOLITICAL TENSIONS
2010
CHINA BANS EXPORTS OF RARE EARTH ELEMENTS TO JAPAN
AUGUST 2023
CHINA LIMITS EXPORT OF GALLIUM AND GERMANIUM
NOVEMBER 2023
CHINA TIGHTENS CONTROL OF EXPORT OF RARE EARTH ELEMENTS
THE US, AUSTRALIA & UK
ARE ON THE RACE TO SECURE RELIABLE SOURCES OF RARE EARTH ELEMENTS
DECEMBER 2023
CHINA BANS EXPORT OF TECHNOLOGY TO PRODUCE RARE EARTH PERMANENT MAGNETS
WHATS NEXT?
―――
ASX:VTM
www.victorymetalsaustralia.com
SOURCE: https://www.cnbc.com/id/39318826 | SOURCE: https://edition.cnn.com/2023/09/21/economy/china-chip-material-exports-drop-intl-hnk/index.html | SOURCE: https://www.scmp.com/economy/china-economy/article/3240608/china-tightens-controls-over-rare-earth-exports-imports-key-commodities-including-crude-oil-iron-ore
THE IMPORTANCE OF
RARE EARTH ELEMENTS
FOR DEFENSE INDUSTRIES
SOURCE: https://www.airandspaceforces.com/article/rare-earth-uncertainty/
ASX:VTM
www. v i c t o r ym et al sau st r al i a. c o m
2024 DEVELOPMENT PLAN
―
Project
Study
VICTORY METALS
―
―
―
Process
―
―
Upgrade
of Mineral
Resource
Estimate
―
Exploration
8.8km North
of MRE area
(assays
pending)
―
works to
generate
copper
cobalt nickel
by-product
―
Ongoing
metallurgy
and
from MREC
beneficiation
studies
―
―
Offtake
discussions
and
government
engagement
―
INVESTMENT HIGHLIGHTS
» AUSTRALIA’S LARGEST Heavy
Rare Earth enriched Deposit
with a premium mix of REE
» HIGH METALLURGY RECOVERIES
» SIGNIFICANT UPSIDE with
exploration 8.8km north of MRE
confirming World Class Dy+Tb
ratios 7.75%
» 100% OWNED adjacent to one of
of valuable and critical Heavy Rare
Earth Elements
Australia’s major arterial networks
the Great Northern Highway
» Potential to become one of the
» Infill MRE drill program
COMPLETED WITH ASSAYS
PENDING designed to increase
grade, size and confidence
WORLDS LARGEST heavy rare
earth element clay projects
» PROVEN LOW COST RECOVERY
with potential of copper, cobalt,
» Initial MRE 250MT
AND 130,000T of TREO
ASX:VTM
nickel, gold and scandium
by-products
www.victorymetalsaustralia.com
COMPANY OVERVIEW
Board of Directors and Victory Team
Capital Structure
As at 08/02/2024
Brendan Clark
Chief Executive Officer and Executive Director
Current Share Price
$0.22
Trevor Matthews
Non-Executive Chairman
Market Capitalisation
$17.5m
James Bahen
Non-Executive Director & Company Secretary
Shares On Issue
80,899,656
Robbie Featherby
Joint Company Secretary
Professor Ken Collerson
Technical Advisor
Options, performance
rights and Performance
shares on issue
18,370,305
Michael Busbridge
Chief Geologist
Top 20% ownership
41.1%
Alannah MacTiernan
Strategic Relations Advisor
Board and founders
28.3%
ASX:VTM
www.victorymetalsaustralia.com
CONTACT
INFORMATION
REGIONAL TENEMENT MAP
t: +61 08 6555 2950
e: info@victorymetalsaustralia.com
w: www.victorymetalsaustralia.com
a: Suite 1, 295 Rokeby Rd, Subiaco WA 6008
BRENDAN CLARK
CEO AND EXECUTIVE DIRECTOR
e: b.clark@victorymetalsaustralia.com
JANE MORGAN
INVESTOR AND MEDIA RELATIONS
e: jm@janemorganmanagement.com.au
ASX:VTM
THE FUTURE
OF AUSTRALIAN
HEAVY RARE EARTHS
Share your feedback
Discover