MAIDEN ORE RESERVE, UPDATED MRE AND PFS
Released
Released
Announcement PDF
ASX: VTM Victory Metals Limited ACN 124 279 750
Suite 1, 295 Rokeby Road, Subiaco Western Australia 6008
Email: admin@victorymetalsaustralia.com www.victorymetalsaustralia.com
ASX RELEASE 18 AUGUST 2026
20XX
MAIDEN ORE RESERVE, UPDATED MINERAL RESOURCE
AND PRE-FEASIBILITY STUDY
Victory Metals Limited (ASX: VTM) (Victory or the Company) is pleased to report the
results of the Maiden Ore Reserve Estimate (ORE), updated August 2026 Mineral
Resource Estimate (MRE) and a Pre-Feasibility Study (PFS) for its 100%-owned North
Stanmore Heavy Rare Earth & Critical Mineral Project near Cue, Western Australia.
This announcement has been authorised by the Board of Victory Metals Limited.
For further information please contact:
Brendan Clark Jim Carden
CEO and Executive Director Investor and Media Relations
admin@victorymetalsaustralia.com jimc@bastionagency.com
Maiden Ore Reserve,
Updated Mineral Resource
and Pre-Feasibility Study
18 AUGUST 2026
THE FUTURE OF AUSTRALIAN HEAVY RARE EARTHS
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
2
PRE-FEASIBILITY STUDY (PFS)
AND MINERAL RESOURCE UPGRADE
ESTABLISH 20 YEAR HEAVY RARE
EARTH DEVELOPMENT CASE
Victory Metals Limited (ASX: VTM)
is pleased to report the results of the North Stanmore Pre-Feasibility
Study (PFS), an updated August 2026 Mineral Resource Estimate
(MRE) and a maiden Ore Reserve Estimate (ORE) for its 100%-owned
North Stanmore Heavy Rare Earth Project near Cue, Western Australia.
We acknowledge the Traditional Owners of the land on which the
North Stanmore Project is located, and pay our respects to the
Wajarri Yamaji and Yugunga-Nya past and present.
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
1
Figure 1. Artist impression of Victory’s Heavy Rare Earth low cost 2.4Mt pa flotation processing plant
to be constructed at North Stanmore, Cue Western Australia.
POST TAX NPV8
A$1.21B
8% real discount rate
INITIAL PROJECT PERIOD
~20 yrs
~10 yrs mining & processing
+ ~10.5 yrs processing stockpiles
POST-TAX PAYBACK
~1.5 yrs
From first production
HIGH-GRADE MRE DOMAIN
53.3 Mt
1,024 ppm TREO
Measured, Indicated & Inferred
CONCENTRATE GRADE
FROM PILOT PLANT
~7.1%TREO
Approx 59x pilot upgrade
PRE TAX NPV8
A$1.76B
8% real discount rate
PLANT THROUGHPUT
2.4 Mtpa
Base-case design
ANNUAL CONCENTRATE
~29,000
(Wet TPA) HREO-enriched
mineral concentrate
CAPEX
A$155m
Class 4 est inc 30% contingency
PROBABLE ORE RESERVE
47.0 Mt
692 ppm TREO | 248 ppm HREO
HREO RATIOS
FROM PILOT PLANT
~40%
HREO/TREO in pilot concentrate
LOM FOB REVENUE
A$6.5B
Maiden Ore Reserve, Updated Mineral Resource
and Pre-Feasibility Study
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
2
The Maiden Ore Reserve, Mineral Resource update and PFS bring together
oneofthelowestcostheavyrareearthprojectsinageopoliticallysaferegion,
with the scale, grade and confidence to support a robust development
case. The maiden 47 Mt Ore Reserve included within 154.8 Mt Measured
and Indicated Mineral Resource materially strengthens the foundation for
mine planning, while the defined 53.3 Mt high-grade domain is directly
relevant to our initial development strategy.
The numbers speak for themselves. With initial capital of just A$155 million,
the PFS delivers a pre-tax NPV8
of A$1.76 billion and pre-tax IRR of 338%,
with payback in just 1.5 years. On a post-tax basis, the Project still returns
an NPV8
of A$1.21 billion and an IRR of 240%. These are exceptional returns
for a critical minerals project of this scale, and reflect both the low capital
intensity of our development concept and the strength of the deposit rare
earth basket.
The PFS outlines a straightforward development concept based on shallow,
predominantly free-dig mining, and beneficiation to produce a heavy rare
earth-enriched mineral concentrate. The Project’s hydrated secondary
phosphate mineralogy and high HREO/TREO ratio provide clear technical
differentiation from project’s targeting refractory primary mineralisation,
and light rare earth rich leachable clay deposits. The projects unique
mineralogy also underpins the low processing and G&A cost of A$28.38 per
tonne processed.
The mine schedule is designed around approximately ten years of mining
and a further ten years of processing stockpiled ore, generating an initial
20-year development case with LOM revenue of A$6.5 billion on a FOB basis.
Our DFS work will now focus on validating and optimising the process,
completing the approvals pathway, advancing offtake discussions, and
refining the funding strategy.
Brendan Clark
Chief Executive Officer and Executive Director
“
”
2
CEO ADDRESS
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
3
FINANCIALS
Measure Unit PFS working value
Plant throughput Mtpa 2.4
Ore processed Mt 48.4
Initial project period Years 20
LOM revenue – FOB A$B 6.5
Initial process/infrastructure capital A$M 155
Processing plus sitewide General & Admin (G&A) A$/t processed 28.38
All in sustaining costs (AISC) A$/wt ore 79.77
Pre-tax NPV8
(8% real) A$M 1,762
Pre-tax IRR % 338
Pre-tax payback Years 1.5
Post-tax NPV8
(8% real) A$M 1,211
Post-tax IRR % 240
Post-tax payback Years 1.5
Table 1:
1. Tonnages are reported on a wet basis as this is reflective of an as-handled material
2. The financial model assumes a forward AUD/USD exchange rate at a weighted averaged of 0.69.
The basis for this assumption and the Project’s sensitivity to alternative exchange rates are presented
in the Sensitivity and Material Economic Assumptions section.
3. Australian corporate tax rate of 30% is applied.
4. Applicable Western Australian State mineral royalty of 5% is applied.
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
4
PRODUCTION
Production - Contained Oxide Unit
Total High Grade Low Grade
Average LoM Average LoM Average LoM
Production - TREO dt 1,156 23,692 1,868 19,155 221 4,537
Production - TREO Hf dt 1,168 23,952 1,881 19,281 228 4,671
Production - Neodymium
Praseodymium (NdPr)
dt 219 4,495 362 3,711 38 784
Production - Terbium dt 6 120 9 97 1 23
Production - Dysprosium dt 36 744 58 598 7 146
Production - Samarium dt 37 751 60 616 7 134
Production - Gadolinium dt 36 741 59 603 7 138
Production - Yttrium dt 229 4,701 364 3,736 47 965
Production - Lutetium dt 3 64 5 50 1 14
Production - Hafnium dt 13 260 12 126 7 134
Table 2: Production by contained oxide
Production Basis
The PFS production target is based entirely on the 47.0 Mt Probable Ore Reserve. The schedule excludes
Inferred Mineral Resources and Exploration Targets. Material assumptions include the production schedule,
metallurgical recoveries, pricing and payability, foreign exchange, capital and operating costs, royalties,
logistics, funding and approvals pathway described in this announcement.
Figure 2: Pilot Plant at Victory Metals Burswood Western Australia
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
5
UPDATED AUGUST 2026 MINERAL RESOURCE ESTIMATE
Updated August 2026 Mineral Resource Estimate
The updated global MRE includes 53.3Mt of high grade domain at 1,024 ppm, introduces a maiden 70.7 Mt
Measured category, measured and Indicated Resources totaling 154.8 Mt and 278.8 Mt at 483 ppm TREO. The
high-grade domain retained approximately 97% of its August 2025 tonnage and 99% of its average grade,
while higher-confidence high-grade tonnage increased to 38 Mt. The MRE update includes the addition of
assays from 83 drillholes totalling 4,378m.
A total of 20 twin air core drillholes (1,244 m) and 63 additional air core drillholes (3,134 m) were incorporated
into the August 2026 Mineral Resource Estimate update. The 20 twin holes, drilled within the central portion
of the MRE area, confirmed existing drilling results and did not result in any material change to the Mineral
Resource. Assay results for the 63 additional drillholes were received in May 2026; however, relogging was
required to ensure correct lithotype designation, which deferred release of the updated drill intersections
until the August 2026 PFS announcement. The need for relogging was previously outlined in the ASX
announcement dated 9 July 2026 titled “Victory Dispatches Heavy Rare Earth Concentrate to Potential
Offtake Partners.”
Updated August 2026 high-grade Mineral Resource domain
Classification Tonnes (Mt) TREO (ppm) HREO (ppm) LREO (ppm) HREO/TREO (%)
Measured 18.43 1,035 329 706 32.1
Indicated 19.59 1,008 331 677 32.3
Inferred 15.31 1,029 335 694 32.7
Total 53.34 1,024 332 692 32.4
Table 3: MRE cutoff grade >=600 ppm TREO. Numbers are rounded to reflect the
appropriate precision of an estimate and may not sum due to rounding.
Updated August 2026 global Mineral Resource Estimate
Classification Tonnes (Mt) TREO (ppm) HREO (ppm) LREO (ppm) HREO/TREO (%) HfO2
(ppm)
Measured 70.67 535 192 343 36 7.4
Indicated 84.09 510 180 329 35 7.0
Inferred 124.04 434 154 281 35 6.8
Total 278.80 483 171 311 36 7.0
Table 4: MRE cutoff grade >=300 ppm TREO, excluding Sc.
LREO equals TREO less HREO. Numbers are rounded to reflect the appropriate
precision of an estimate and may not sum due to rounding.
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
6
MRE Comparison
Metric August 2025 August 2026 Change
Global MRE tonnage 320.6 Mt 278.8 Mt -13.0%
Global average TREO grade 486 ppm 483 ppm -0.6%
High-grade domain tonnage 55.0 Mt 53.3 Mt -3.1%
High-grade average TREO grade 1,029 ppm 1,024 ppm -0.5%
High-grade M+I 35.5 Mt 38.0 Mt +7.2%
Measured Resource Nil 70.7 Mt Maiden category
Table 5: Numbers are rounded to reflect the appropriate precision of an estimate.
MAIDEN ORE RESERVE AND PRODUCTION TARGET
The PFS supports a maiden Probable Ore Reserve of 47.0 Mt at a ≥300 ppm TREO cutoff. The corresponding
Ore Reserve grades are reported on a dry basis. The PFS base-case production target is underpinned 100%
by the Probable Ore Reserve; no Inferred Mineral Resources or Exploration Targets are included in the base-
case production schedule.
Maiden Ore Reserve Estimate
Category
Tonnes
(Mt)
TREO
(ppm)
HREO
(ppm)
HfO2
(ppm)
Contained TREO
(kt)
Contained HREO
(kt)
Proved - - - - - -
Probable 47.0 692 248 6.4 32.6 11.6
Total 47.0 692 248 6.4 32.6 11.6
Table 6: ORE cutoff grade >=300 ppm TREO. Numbers are rounded to reflect the
appropriate precision of an estimate.
MINING AND PROCESSING SCHEDULE
Base case schedule concept
Indicative period Operating phase Schedule basis
Initial
~10 years
Mining and
processing
Shallow open-pit mining; higher-grade ore prioritised
& lower-grade ore stockpiled.
Following
~10.5 years
Stockpile
processing
Processing of stockpiled ore after mining ceases.
Table 7: Indicative Project Operating Schedule
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
7
FLOTATION MINERAL CONCENTRATE FROM PILOT OPERATIONS 1
Oxide Feed Ore (ppm)² Prelim. Final Conc. (ppm) Final Conc. (wt%)
La₂O₃ 199 11,517 1.15
CeO₂ 262 14,188 1.42
Pr₆O₁₁ 43 2,730 0.27
Nd₂O₃ 177 11,582 1.16
Sm₂O₃ 38 2,447 0.24
Eu₂O₃ 9 616 0.06
Gd₂O₃ 43 2,847 0.28
Tb₄O₇ 7 479 0.05
Dy₂O₃ 45 2,777 0.28
Ho₂O₃ 9 561 0.06
Er₂O₃ 28 1,624 0.16
Tm₂O₃ 4 248 0.02
Yb₂O₃ 26 1,418 0.14
Lu₂O₃ 4 221 0.02
Y₂O₃ 301 17,652 1.77
TREYO 1,195 70,906 7.09
HREYO (ppm) 476 28,442 2.84
HREO:TREO 40% 40% 40%
Hf 9.4 196 0.02
Zr 390 9,631 0.96
Ti 8,176 34,800 3.48
Ce/Ce* 0.63 0.57 0.57
ThO₂ (ppm) 13 578 0.06
U₃O₈ (ppm) 4 119 0.01
²³²Th activity (Bq/g) 0.05 2.35 2.34
²³⁸U activity (Bq/g) 0.04 1.47 1.47
Table 8: Flotation Mineral Concentrate from Pilot Operations
1 Refer to ASX announcement dated 17th
June 2026 https://investors.victorymetalsaustralia.com/announcements/7587356
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
8
PRICING, REVENUE ASSUMPTIONS AND MARKET OVERVIEW
The North Stanmore product strategy is directed toward non-Chinese supply chains for heavy rare earths
and strategic metals. Demand is expected to be driven principally by permanent magnets, defence, energy
and advanced industrial applications.
This approach is supported by USA Rare Earth’s recent US$2.8 billion acquisition of Serra Verde, announced
in April 2026. Serra Verde’s projected life-of-mine revenue basket is heavily weighted toward yttrium,
dysprosium and terbium - approximately 42%, 19% and 13%, respectively - making it a relevant market
precedent.2
Heavy Rare Earth Pricing Table
Product / oxide Unit
PFS mine-life
net payability
price
Benchmark Mineral
Intelligence
(July 2026)
Argus Media
CIF Europe
(April 2026)
Discount to spot
from Benchmark
Forecast
Dysprosium oxide US$/kg $1,067 $1,900 $1,450 44%
Terbium oxide US$/kg $2,488 $5,500 $4,500 55%
Yttrium oxide US$/kg $453 $1,800 $1,100 75%
Table 9: Heavy Rare Earth Pricing Table 3
Product / oxide Unit
PFS mine-life net
payability price
Benchmark Mineral
Intelligence (July 2026)
Discount to spot from
Benchmark Forecast
Neodymium oxide US$/kg $72 $110 35%
Praseodymium oxide US$/kg $72 $110 35%
Hafnium oxide US$/kg $4,001 $12,500 68%
Table 10: Light Rare Earths & Hafnium Pricing Table
Product Payability
The PFS financial model applies a payability of 65% to all payable rare earth oxides and 50% to hafnium oxide.
Payability represents the proportion of the gross contained oxide value, following metallurgical recovery,
that is recognised as revenue. It provides an aggregate allowance for downstream treatment and refining,
processing losses, product qualification, commercial deductions and potential product-specification
requirements. Product haulage and shipping costs are modelled separately.
Market-indicated payabilities for rare earth concentrates span a wide range and are not directly comparable
across products. Payability depends on concentrate grade, mineralogy, recoverability, deleterious elements,
radionuclide content, required treatment intensity, customer specifications and the commercial structure
of the transaction. Commonly referenced rare earth concentrates may contain primary mineral phases such
as monazite or xenotime, which can require more intensive cracking and refining and may be subject to
additional radionuclide-related handling, transport and processing requirements.
2 USA Rare Earth, Inc., USA Rare Earth + Serra Verde: The Global Leader in Rare Earths, investor presentation, April 2026, slides 4–5,
furnished as Exhibit 99.3 to USA Rare Earth’s Form 8-K dated 20 April 2026, US Securities and Exchange Commission.
3 Pricing Notes. PFS prices are net payability inputs and assume 65% payability to allow for downstream processing for REE and 50%
payability for hafnium. They are deliberately discounted to recent spot prices. The additional yttrium discount reflects potential new
ex-China supply additions after 2036, consistent with the outlook referenced in Benchmark Mineral Intelligence’s Q2 2026 report.
Percentages are approximate and may reflect rounded market references. Price forecast for Nd, Pr and ex-China Dy, Tb, Y are ref-
erenced in Benchmark Mineral Intelligence’s Q2 2026 forecast report. Hf current spot price is referenced by Strategic Metals Invest
August 2026 current price.
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
9
The North Stanmore concentrate is mineralogically distinct from many primary rare earth concentrates.
Pilot-scale test work has produced a heavy rare earth-enriched concentrate in which the rare earths are
substantially associated with hydrated secondary phosphate mineral phases. Victory considers that this
mineralogy may support a less intensive downstream treatment pathway than some refractory primary-
mineral concentrates. However, the extent of any downstream processing or commercial advantage
remains subject to representative test work, customer qualification and negotiation of final product
specifications and commercial terms. The PFS does not assume an additional payability premium for this
potential advantage or that the concentrate will be exempt from radionuclide-related transport, handling
or customer requirements.
The adopted payability assumptions are informed partly by preliminary, confidential and non-binding
engagement with prospective offtake, treatment and refining counterparties. These discussions have
provided indicative guidance regarding potential treatment pathways, product acceptance and commercial
payability. Negotiations remain ongoing, and the adopted payabilities are financial-modelling assumptions
rather than agreed or forecast contractual terms.
Pricing Discount Rationale
The valuation adopts long-term, through-cycle gross prices rather than extrapolating current supply-
constrained spot prices commonly reported at Pre-Feasibility stage. Recent contractual floor prices
provide stronger long-term price support for dysprosium and terbium. Other products are assessed more
conservatively where equivalent price protection is absent, particularly given the potential for additional
ex-China mining, separation and refining capacity from 2036 onward. Increased supply diversity, limited
price transparency and greater long-dated forecasting uncertainty have guided the application of heavier
discounts where current spot prices may include a significant scarcity premium.
Yttrium is discounted more heavily than dysprosium and terbium because the valuation adopts a long-term,
through-cycle gross price rather than extrapolating the current supply-constrained spot price. Additional
ex-China yttrium mining, separation and refining capacity may enter supply chains from 2036 onward,
increasing supply diversity and reducing the scarcity premium reflected in current spot pricing. Dysprosium
and terbium benefit from contractual floor prices, whereas yttrium is monetised separately without an
equivalent floor. Given this prospective supply response, limited price transparency and greater long-dated
forecasting uncertainty, the PFS applies a deliberately conservative yttrium price.
“Outside China, yttrium has become exceptionally illiquid; transaction economics can vary enormously by
purity, form, quantity, qualification, origin, and whether export approval and physical inventory exist. In
other words, the relevant question can shift from “What does yttrium cost?” to “Can you actually get it?”4
4 Rare Earth Price Index Hits 259.8 as Yttrium Exposes a Fractured Global Market https://rareearthexchanges.com/news/ra-
re-earth-price-index-yttrium-market/
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
1 0
Figure 3: Ex- China Price Forecast – Medium and Long Term,
retrieved from Benchmark 2026 Rare Earth Forecast
Figure 4: Ex-China Yttrium Price Forecast – Medium and Long Term,
retrieved from Benchmark 2026 Rare Earth Forecast.
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
1 1
Capital Cost Estimate
International EPCM consultancy firm Mincore, headquartered in Melbourne have developed the design
inputs in accordance with the expected accuracy range for an AusIMM Class 4 estimate. The selected case
uses an AUD/USD exchange rate of 0.65 and a budget quotation for processing equipment and non-process
infrastructure. The estimate excludes the mining fleet, which are planned under the contract-mining model.
A 7 MW gas power station is assumed to be provided on a build-own-operate basis, with power charged
through OPEX; camp and messing are assumed to be provided by a third party. Equipment supply freight
of 8% is included.
Initial process and infrastructure capital estimate
Capital component A$M
Process plant and direct capital 78.85
Non-process infrastructure 9.65
Base subtotal 88.49
Contingency (30%) 36.67
EPCM 16.22
Owner costs 3.29
Process mobile plant 5.12
Insurance, spares, temporary facilities and first fills 5.23
Total initial capital 155.03
Table 11: Component values are rounded; totals may not sum precisely due to rounding.
Operating Costs
Cost Centre Unit A$/wT
Mining Inc G&A A$/wt Mined 5.13
Processing Inc G&A A$/wt Fed 28.38
Road Haulage A$/wt Concentrate 59.92
Shipping A$/wt Concentrate 684
Closure and Rehabilitation A$/wt Fed 3.65
Head Office A$/wt Fed 1.53
Table 12: Summary of Operating Cost Assumptions
Australian mining consultancy firm MEC Mining provided support for the mining and associated cost
estimation components of the PFS approximately A$5.13/tonne mined at a strip ratio of ~6.4:1 The selected
processing estimate is A$24.50/t and the sitewide G&A (Ex Mining) allocation is A$3.88/t, giving combined
processing and G&A of A$28.38/t processed (A$60.48 million a year at 2.4 Mtpa).
In addition, the financial model includes the cost of back-hauling tailings within the mining fleet, which is
not included in the Mincore processing cost inputs presented above.
Accordingly, the underlying processing cost assumptions used in the financial model reconcile back to
the Mincore costs presented above at the 2.4 Mtpa design rate. The resulting life-of-mine processing costs
differ only due to the application of the subsequent fixed/variable cost split and the inclusion of tailings
back-haul costs.
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
1 2
SENSITIVITY AND MATERIAL ECONOMIC ASSUMPTION
Pre Tax Project Value Sensitivity Matrix
Sensitivity analysis has been undertaken to assess the effect of changes in the principal technical, operating
and economic variables on pre-tax Project NPV8
. The detailed results are presented in Table 13, with the
relative magnitude of the key sensitivities illustrated by the tornado chart in Figure 5.
-30% /
+30%
-20% /
+20%
-10% /
+10% Base
+10% /
-10%
+20% /
-20%
+30% /
-30%
Revenue - TREO + Hf Basket -949 -186 718 1,762 2,946 4,271 5,736
Processing - Head Grade - TREO + Hf 375 840 1,303 1,762 2,225 2,693 3,148
Revenue - FX 810 1,074 1,387 1,762 2,220 2,794 3,530
Processing - Recovery 524 937 1,349 1,762 2,105 2,426 2,515
Cost - Total - Mining 866 1,191 1,489 1,762 2,009 2,229 2,424
Revenue - Yttrium - Y2O3 1,130 1,341 1,551 1,762 1,973 2,183 2,394
Processing - Feed Rate 1,061 1,310 1,544 1,762 1,935 2,063 2,165
Cost - Total - Payability 1,645 1,660 1,717 1,762 1,951 2,226 2,588
Revenue - Hafnium - HfO2 1,553 1,623 1,692 1,762 1,832 1,901 1,971
Revenue - Dysprosium - Dy2O3 1,555 1,624 1,693 1,762 1,831 1,900 1,969
Table 13: Pre-Tax Project Value Sensitivity Matrix
Figure 5: Pre-Tax NPV8
Sensitivity – Tornado Chart
Figure 5 demonstrates that the principal Project economic risks and opportunities are concentrated around
variables that directly affect product value, delivered plant grade and recovered saleable metal, rather than
being dominated by a single operating-cost component. The product basket, head grade, foreign exchange
and metallurgical recovery therefore represent the principal financial variables to be further defined.
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
1 3
Foreign Exchange Assumption and Sensitivity
The PFS adopts a forward curve AUD/USD exchange rate of 0.69 over the life of the Project. This rate has
been applied consistently to USD denominated revenues and costs included in the financial model. The PFS
does not assume foreign exchange hedging.
This is based on a forward looking exchange rate curve based on analysis from different providers.
The Company has assessed the Project’s financial sensitivity at AUD/USD exchange rates of 0.64, 0.69 and 0.74.
Foreign exchange sensitivity
AUD/USD exchange rate Case Post-tax NPV8
(A$M) Post-tax IRR
0.64 Weaker Australian dollar case 1,435 272%
0.69 PFS base case 1,211 240%
0.74 Stronger Australian dollar case 1,015 212%
Table 14: Post-Tax Project Economics Sensitivity to AUD/USD Exchange Rate
MARKET, OFFTAKE AND PROJECT FUNDING
Market & Offtake Strategy
Victory is advancing confidential discussions with strategic partners across Japan, Europe and the US, focused
on product qualification, pricing, commercial structures and long-term offtake for North Stanmore concentrate.
Funding Strategy
Victory is exploring a diversified funding package, including existing LoI from US EXIM for up to US$190
million (~A$275 million), project debt, strategic equity, offtake related funding and government/export credit
support. Victory is expecting other discussions around non-traditional Australian and international funding
opportunities.
T H E F U T U R E O F A U S T R A L I A N H E A V Y R A R E E A R T H S
1 4
REGULATORY PATHWAY, ROYALTIES AND NEXT STEPS
Regulatory Pathway
To implement the Project, Victory will obtain approvals under State and Commonwealth legislation, including
Environmental, Aboriginal Heritage, Dangerous Goods and Water Acts.
Royalties
The PFS base case assumes the applicable Western Australian State mineral royalty of 5%. Any alternative
royalty treatment associated with further downstream processing is not included in the base case and would
require confirmation against the final product form and applicable royalty framework. No Traditional Owner
royalties are included in this PFS.
Next Steps
• Complete the DFS scope, geotechnical and hydrogeological investigations, and engineering definition.
• Continue pilot and locked-cycle metallurgical programs, product qualification and downstream
test work.
• Advance environmental, water, tenure, heritage and mining approvals.
• Progress offtake discussions and Project funding workstreams.
MATERIAL RISKS AND CAUTIONARY STATEMENTS
Material Project Risks
Risk area Potential impact / mitigation focus
Commodity prices and payability
Heavy rare earth prices and product payability can materially
affect Project value.
Metallurgical recovery and scale-up
Recovery, concentrate grade and product quality assumptions
require further variability, locked-cycle, pilot and product
qualification work during the DFS.
Geotechnical and hydrogeological
definition
Current pit slope and water assumptions require site-specific DFS
investigation and confirmation.
Approvals, tenure and heritage
Development remains subject to environmental, water, tenure,
heritage and other third-party processes and approvals.
Funding, capital and operating costs
Project development depends on securing funding and
controlling capital, operating, logistics and downstream
treatment costs. Estimates will be refined through the DFS.
Table 15: Key Project Risks and Mitigation Measures
Forward-Looking Statements
This announcement contains forward-looking statements, including production targets, forecast financial
information, development plans, timing and Project economics. These statements are based on current
expectations and assumptions and are subject to risks and uncertainties that may cause actual outcomes
to differ materially. Relevant factors include commodity prices, exchange rates, operating and capital costs,
metallurgical performance, resource and reserve conversion, approvals, funding, infrastructure, logistics and
market conditions. Except as required by law, Victory undertakes no obligation to update forward-looking
statements.
V T M P R E - F E A S I B I L I T Y S T U D Y – A U G U S T 2 0 2 6
1 5
Mineral Resources and Ore Reserves
Modifying factors have been applied to Mineral Resources to produce the Ore Reserve estimate. Mineral
Resources that are not Ore Reserves do not have demonstrated economic viability. Mineral Resources and Ore
Reserves must not be added together. Figures are estimates and have been rounded to appropriate precision.
Competent Persons Statements
Mineral Resource Estimate and Exploration Targets
The information in this announcement that relates to exploration targets and Mineral Resource estimates
is based on, and fairly represents, information compiled and reviewed by Dean O’Keefe, who is engaged by
Victory Metals Limited as Chief Technical Officer and Principal of Tiger Lilly Consulting.
Dean O’Keefe is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM #112948) and is
a geologist and geostatistician with sufficient relevant experience in relation to the rare earth element and
critical metal mineralisation being reported to qualify as a Competent Person as defined in the 2012 Edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
The Exploration Target is conceptual in nature, and there has been insufficient exploration to estimate a Mineral
Resource. It is uncertain if further exploration will result in the estimation of a Mineral Resource. Dean O’Keefe
has reviewed the assumptions and supporting data used to develop the Exploration Target and considers
them reasonable for the purpose of illustrating potential project scale.
Dean O’Keefe consents to the inclusion of the information in the form and context in which it appears and is the
Competent Person responsible for the exploration results, exploration target and Mineral Resource estimates.
Ore Reserve Estimate
The Ore Reserve Estimate has been prepared under the joint responsibility of Rodrick Bonner and Paul King,
who each qualify as Competent Persons as defined in the JORC Code (2012 Edition).
Rodrick Bonner is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM #335642) and
Principal Mining Engineer permanently employed by MEC Technical Services Pty Ltd., with sufficient relevant
experience in the style of mineralisation and deposit type being reported, mining method, and modifying
factors, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves.
Paul King is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM #301413) and Principal
Mining Engineer permanently employed by MEC Technical Services Pty Ltd., with sufficient relevant experience
in the style of mineralisation and deposit type being reported, mining method, and modifying factors, to qualify
as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.
• Rodrick Bonner has Competent Person responsibility for economic pit limi