OUTSTANDING NORTH STANMORE SCOPING STUDY
DELIVERED IN TIER 1 MINING JURISDICTION
Victory Metals Ltd (ASX: VTM, Victory or the Company) is pleased to announce the completion of
its highly anticipated Scoping Study (Scoping Study) for the North Stanmore Rare Earth Project
(North Stanmore Project) in Western Australia.
As one of the largest heavy rare earth and scandium clay projects globally, the North Stanmore
Project presents a unique opportunity to establish a long-term, low-cost supply of critical minerals
essential for high-growth industries such as renewable energy, electric vehicles and defense. The
Scoping Study confirms North Stanmore’s significant economic and environmental advantages over
conventional rare earth projects.
North Stanmore is located in the Tier-1 mining jurisdiction of Western Australia where both Federal
and State Governments have committed billions of dollars of support for rare earth projects1.
Victory has also entered into a non-binding memorandum of understanding (MOU) to negotiate an
offtake agreement with fortune 500 company Sumitomo Corporation2. The Company looks forward
to advancing the next steps with Sumitomo, following the release of this exceptional Scoping Study.
This milestone marks a key step in Victory’s strategy to advance North Stanmore towards
production, as the company continues discussions with potential partners, funders, government
and progresses towards further development.
Cautionary Statement
The Scoping Study referred to in this ASX release (the “Study”) has been prepared to assess the potential viability of producing a
Mixed Rare Earth Carbonate ('MREC’) and scandium oxide from the North Stanmore Rare Earth Project by constructing a mining
and production facility. The Study is based on low-level, preliminary technical and economic assessments, generally to a level of
+/- 35% accuracy that is not sufficient to support the estimation of Ore Reserves or to support any financial investment of
development decision, or to provide certainty that the conclusions of the Study will be realised. The Study provides an initial
evaluation of the Project’s potential development pathway; however, it remains at an early stage and should not be considered a
definitive feasibility study. Further exploration and evaluation work, test work and studies are required before VTM will be in a
position to estimate any Ore Reserves, to provide any assurance of an economic development case, or to provide certainty that
the conclusions of the Study will be realised.
To achieve the range of outcomes indicated in the Study, funding in the order of $337 million will likely be required. Investors
should note that there is no certainty that Victory will be able to raise that amount of funding when needed. It is also possible
that such funding may only be available on terms that may be dilutive to or otherwise affect the value of VTM’s existing shares.
The Study incorporates material assumptions, outlined elsewhere in this announcement, regarding geology, metallurgy,
processing, mining, capital and operating costs, and market conditions, and the availability of funding. These assumptions, while
developed with due diligence and based on reasonable grounds and available information, remain subject to further refinement
through additional exploration, technical studies, and economic assessments. There is no certainty that the conclusions or
outcomes presented in this Study will be realised.
The Study includes Indicated and Inferred Mineral Resources with 72% of the Study including Indicated category and 28% Inferred
category, which are inherently uncertain due to their lower confidence level. The economic viability of these resources has not
1 https://www.exportfinance.gov.au/newsroom/transforming-australia-s-critical-minerals-sector/
2 ASX Release 17th December “Strategic Offtake MOU Signed with Fortune Global 500 Leader Sumitomo Corporation”
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
yet been demonstrated, and there is no guarantee that further exploration work will result in the conversion of Inferred Resources
to higher-confidence categories or that a viable mining operation will be established. There is a low level of geological confidence
associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination
of Indicated Mineral Resources or that the production target itself will be realised. The Mineral Resource estimates underpinning
the production target and forward-looking financial information in the Study and this announcement have been prepared by
competent persons in accordance with the requirements of the JORC Code (2012).
Investors and stakeholders should be aware that the findings of this Study are subject to various material risks, including but not
limited to fluctuations in commodity prices, metallurgical recoveries, permitting and regulatory approvals, infrastructure
availability, funding, and operational factors. VTM does not guarantee that the Project will proceed to production, and any future
development remains contingent upon further feasibility studies, financing, and regulatory approvals.
This announcement contains forward-looking statements that relate to the Company’s expectations, intentions, plans, and beliefs
concerning future events and outcomes. These statements may include words such as “anticipate,” “believe,” “estimate,”
“expect,” “intend,” “may,” “plan,” “potential,” “project,” “should,” and similar expressions. VTM has concluded that it has a
reasonable basis for providing forward-looking statements included in this announcement and believes that it has a reasonable
basis to expect it will be able to fund the development of the North Stanmore Rare Earth Project. Forward-looking statements
inherently involve known and unknown risks, uncertainties, and other factors that may cause actual results, performance, or
achievements to differ materially from those expressed or implied.
While VTM has made reasonable efforts to ensure the accuracy of the information contained in this announcement, no
representation or warranty, expressed or implied, is made as to its accuracy, reliability, or completeness. Except as required by
law, the Company does not undertake to update any forward-looking statements based on new information, future events, or
circumstances. Investors are cautioned not to place undue reliance on forward-looking statements or the findings of this Study.
VTM will continue to advance the Project through systematic technical and economic evaluations to improve confidence in the
Project’s viability and development potential.
Victory’s CEO and Executive Director Brendan Clark commented:
“The completion of our Scoping Study is a defining milestone for Victory Metals, confirming North
Stanmore as a world-class heavy rare earth and scandium project with outstanding economics. The
study delivers an exceptional robust case even based on Adamas Intelligence lower case price
forecast, with a Net Present Value (NPV) exceeding AUD $1,212m and a very high internal rate of
return (IRR), reinforcing the project's strong financial viability and low-cost advantage.
Heavy rare earths, particularly dysprosium and terbium along with emerging defence metals such
as scandium and hafnium, are in growing global demand due to their critical importance and
emerging supply constraints. As industries increasingly look for sustainable, high-performance and
defence materials, the outlook continues to strengthen in these markets, presenting another
compelling and diversified off-take opportunity for Victory Metals.
The combination of a globally significant resource, low CAPEX and strong market fundamentals sets
North Stanmore apart as a unique and highly strategic project. We are now focused on advancing
towards production while continuing discussions with potential partners to further de-risk
development and maximise shareholder value.”
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
Executive Summary
•
Robust estimated net present value (NPV) across multiple pricing scenarios:
o AUD $1,212m Post Tax 52% IRR
▪ AUD $1,777m Pre Tax
▪ based on Adamas Intelligence downwards forecast
o AUD $711m Post Tax 36% IRR
▪ AUD $1,060m Pre Tax
▪ based on Asian Metal Market spot price of NdPr USD $62kg
o AUD $868m Post Tax 41% IRR
▪ AUD $1,285m Pre Tax
▪ based on Adamas Intelligence 10-year historical NdPr USD $82kg
•
Victory targeting to be a Western supplier of rare earths elements, scandium and hafnium
with strong support from off-takers for security of supply ex-China
•
8Mtpa throughput due to shallow nature of the mineralisation with favourable weather
conditions
•
31-year mine life with 72% of the resource being in the Indicated category and 28% being in
the Inferred category
•
Existing Mineral Resource Estimate (MRE) set to rapidly grow with mineralisation remaining
open in all directions and a strong exploration target3 being recently identified outside of
this resource
•
Capital expenditure (CAPEX) of approximately AUD $337m including a 30% contingency with
costs being calculated to a class 5 estimate type, Association for the Advancement of Cost
Engineering (AACE) classification
•
Lower CAPEX costs due to access to existing infrastructure and no requirement for transient
camps, haul roads etc
•
Low OPEX of approximately AUD $25.5 per ROM tonne over the life of mine (LOM) due to
the unique geology of North Stanmore and an extensive weathering event leading to high
metallurgical extractions
•
Significant project savings due to North Stanmore being a contiguous package, situated on
crown land with no private landowners and no existing royalties
•
Victory set to produce a very high value and quality heavy rare earth enriched product
•
Outstanding metallurgical recovery of 94% for magnet rare earth oxide (MREO)
•
Scandium and hafnium successfully separated from the (MREC) with both metals critical for
defence, aerospace and decarbonisation
The Scoping Study, led by independent engineering consultants Mincore, demonstrates North
Stanmore’s strong economic potential, low capital intensity, and strategic advantages as a future
supplier of critical minerals. Mincore has extensive experience in rare earth clay projects and
operates from offices in Melbourne (Head Office), Gold Coast, Tasmania, Fiji, the Philippines, West
Africa, and Bolivia.
3
ASX Release 25th February “New Exploration Target at North Stanmore Project”
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
The financial results for the Scoping Study, based on an 8% discount, factor for an estimated NPV of
approximately AUD $1,212 million with an IRR of 52%. The material assumptions underlying the
results of the Scoping Study are discussed throughout this announcement. The financial evaluation
of the Scoping Study delivers very strong economic results, but with several key uncertainties that
could have significant impacts on the final results. These will be presented in the sensitivity section
of this report. The summary results are present in the below table.
Table 1: Summary Financial Results
Description
Unit
LOM Results
TREO Mixed Rare Earth Carbonate (MREC) Production excludes
Ce & La
Scandium & Hafnium Oxide Production
Revenue
Operating Cost
Capital Cost
Tax Paid
Net Cash
Current Mine Life
Payback
kt
AUD$M
AUD$M
AUD$M
AUD$M
AUD$M
Years
Years
NPV @ 8% real discount post-tax
IRR post-tax
Operating Margin
AUD$M
%
%
Result
kt
59.3
3.08
11,849
6,915
337
1,339
4,591
31
2
Financial Results
1,212
51.8
42
A total of 13 different rare earth oxides, plus scandium and hafnium, will be recovered to the
saleable concentrate.
Victory has strategically positioned itself to prioritise high-value, in-demand rare earth elements by
excluding low-value commodities such as Cerium and Lanthanum. This differentiation is critical in
understanding the true economic potential of our project.
While some rare earth producers report an “All-In Sustaining Cost” (AISC), this metric is often
influenced by high-tonnage, low-value products such as Cerium and Lanthanum which can distort
the cost-per-unit comparison. Given Victory’s focus on a premium product suite – rich in high-value
heavy rare earths such as Dysprosium, Terbium, and strategic elements including Scandium and
Hafnium – AISC alone does not provide an accurate reflection of our economic model.
Instead, Victory emphasises the importance of understanding the overall basket price, which more
effectively captures the revenue potential of our product mix. The Company’s streamlined
approach ensures that every tonne processed is targeted towards maximising value, reinforcing
Victory’s commitment to delivering a commercially and strategically superior rare earth supply .
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
Table 2: North Stanmore Basket Price Scenarios
Price
Scenario
AUD $189 per kg
Adamas 2025 downwards price forecast
AUD $160 per kg
NdPr Asian Metal Market spot price USD $62 kg
AUD $169 per kg
Adamas NdPr 10-year historical price USD $82 kg
AUD $142 per kg
Adamas 2025 downwards price forecast excluding Sc & Hf
Core Strengths & Strategic Advantage
The Scoping Study confirms that North Stanmore has the potential to be one of the lowest-cost
producers of rare earths globally, driven by:
4
•
High-value resource mix, with a focus on heavy rare earths (Dysprosium and Terbium), which
are critical for electric vehicles, wind turbines, and defence applications
•
Significant scandium endowment, supporting demand for lightweight aluminium
alloys in aerospace, automotive, and hydrogen fuel cell technologies
•
High-value hafnium, utilised for its exceptional heat resistance, is a strategic resource critical
to nuclear reactor safety, aerospace alloys, and semiconductor manufacturing
•
Successful metallurgical test work, confirming:
o
Overall TREO recovery of 87%, demonstrating excellent leach efficiency
o
Exceptional magnet (high value) rare earth recoveries of 94%, including:
▪
Praseodymium (Pr) – 97%
▪
Neodymium (Nd) – 97%
▪
Terbium (Tb) – 94%
▪
Dysprosium (Dy) – 87%
•
Geopolitical stability as an Australian-based project enables Victory to apply for certain
Federal and State Government funding initiatives for rare earth developments (Victory is yet
to benefit from these initiatives)4
•
Favourable weather conditions, making tailings management significantly more robust than
projects in high-rainfall regions
•
Proximity to key infrastructure, including:
o
Cue township, providing opportunities for local workforce, regional airport access
and offsite transient accommodation options lowering CAPEX
o
Direct access to the Great Northern Highway, linking the project to Fremantle and
Geraldton ports for streamlined export logistics
https://www.exportfinance.gov.au/newsroom/transforming-australia-s-critical-minerals-sector/
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
•
Radioactivity levels of Uranium (2.4ppm) and Thorium (8.5ppm) lower than upper
continental crustal abundances, reducing permitting risks and simplifying environmental
approvals and final product sales
Pathway to Development
Victory Metals has entered into a non-binding memorandum of understanding (MOU) to negotiate
a binding offtake agreement with Sumitomo Corporation, one of Japan’s largest trading houses,
highlighting early commercial interest. With strong financial metrics, world-class infrastructure
access, and increasing demand for heavy rare earths and scandium, the North Stanmore Project
is well-positioned to become a key global ethical source of critical minerals.
The completion of the Scoping Study represents a major milestone for Victory as it advances the
project towards the next stage of development, while engaging with potential strategic partners
and government stakeholders.
Table 3: Production Metrics Cashflow & Earnings Cost Metrics
Production Metrics
Unit
Ore Mined
Strip Ratio
Average TREO Feed Grade
Average HREO/TREO
Average Annual Production TREO High Quality MREC
NdPr in TREO
DyTb in TREO
LOM
kt
waste:ore
ppm
%
t
%
%
247.6
1.8-1
520
36
1,913
36
7
Table 4: Cashflow & Earnings Metrics
Cashflow & Earnings Metrics
Annual Revenue
Annual EBITDA
Operating Cashflow
Revenue
EBITDA
Cumulative Post Tax Cashflow Excluding Construction
Cost
Unit
LOM
Adamas
AUD$M
AUD$M
AUD$M
AUD$M
AUD$M
377
155
149
11,849
4,939
AUD$M
3,252
Unit
LOM Average
Table 5: Operating Costs
Cost Metrics
Operating Cost
AUD$M
204
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
Table 6: Financial Outputs
Financial Outputs
LOM
Adamas
Unit
Pre-Tax NPVs (8%)
Pre-Tax IRR
Post-Tax NPVs (8%)
Post-Tax IRR
CAPEX Payback Period
Payability – High Quality Heavy Rare Earth MREC
Capex Inclusive of 30% Contingency
AUD$M
%
AUD$M
%
years
%
AUD$M
1,777
68
1,212
52
2
85
337
*Excluding Ce and La
Financial
The financial assessment of the North Stanmore heavy rare earth, scandium and hafnium project
has been completed based on the inputs outlined in the remainder of this report and based on
Adamas Intelligence 2040 price forecasts over three scenarios – Low Case Pricing, Base Case Pricing
and High Case Pricing.
Victory chose to base its financial modelling on the Low Case Pricing option to show how robust the
North Stanmore Project is to a multiple array of financial modelling scenarios. The Base Case option
is defined as:
•
•
•
8.0 Mtpa ROM production
No beneficiation included into the pre-hydrometallurgical flowsheet
High grade mineral resource mined in the initial years of the mining schedule
The financial returns for the different pricing assumptions based on Adamas Intelligence 2025 rare
earth element to 2040 price forecast are tabled below:
Table 7: Financial Outputs for Price Assumptions5
Rare Earth Oxide
Unit
Low Case Pricing
Base Case Pricing
High Case Pricing
NPV (8%)
IRR
AUD M
%
1,212
52
1,476
59
1,688
65
PrNd Pricing Assumptions
The pricing for the base case for PrNd has been based on a low range from Adamas and these
combined REOs represent 31% of the total revenue. For sensitivity analysis, the following tables
present the financial results based on:
• Asian Metal Market spot price (26/02/2025): USD62/kg
• Adamas Intelligence 10-year historical pricing: USD82/kg
5 https://www.adamasintel.com/rare-earths/
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
Table 8: Financial Outputs for Price Assumptions
Rare Earth
Oxide
Unit
NPV (8%)
IRR
AUD M
%
NdPr
Downwards
Case Price
Asian Metal
Market
Spot Price
10 year
Historical Price
USD128/kg3
1,212
52
USD62/kg6
711
36
USD82/kg3
868
41
During the Scoping Study, several alternative scenarios were assessed before determining the base
case as the preferred option. These alternative cases included:
•
•
•
Alternative scales including 4Mtpa and 16Mtpa and including ramping from one scale to
another
Inclusion of a beneficiation plant resulting in mass reduction, and associated REO loss, into
the leaching circuit
Various leach performance parameters including a trade of between lixiviant consumption
and REO recoveries
Location & Infrastructure
The North Stanmore Project is strategically located in Western Australia, a Tier-1 mining jurisdiction
known for its stable regulatory environment, strong government support, and established mining
infrastructure. The project is geopolitically secure, ensuring minimal sovereign risk for investors and
stakeholders, a key advantage over rare earth developments in higher-risk jurisdictions.
Key Infrastructure & Logistics Advantages
•
6
Proximity to Cue Township:
o
The project is located near Cue, a well-serviced regional town, accommodation, and
essential services to support mining operations
o
Cue Regional Airport provides convenient access for personnel and logistics
https://www.asianmetal.com/
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
Figure 1: Location map showing Victory’s proximity to Cue township and the Great Northern Highway
•
Established Transport Links:
o
The Project is directly adjoined by the Great Northern Highway, a major transport
route enabling efficient haulage to:
▪
Geraldton Port (~450km) – a critical export hub for mineral concentrates
▪
Fremantle Port (~700km) – providing direct access to international markets
Figure 2: Great Northern Highway, Cue that runs through part of Victory’s tenement package
•
Favourable Climate & Tailings Management:
o
Unlike high-rainfall jurisdictions that face tailings management and operational
challenges, North Stanmore benefits from low annual rainfall, reducing the risk of
environmental and operational delays
o
Arid climate conditions support efficient waste storage and water recycling, lowering
processing costs and environmental impact
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
•
Westgold’s Hybrid Power Success:
o
Westgold Resources Limited (ASX: WGX), a leading gold mining company operating
in
the
region,
has
successfully
implemented
a hybrid
power
plant combining renewable energy with gas-fired generation, demonstrating the
potential for cost-effective and sustainable power solutions at North Stanmore
Figure 3: Westgold Resources Limited recently commissioned hybrid power station in Cue
o
•
Victory is set to explore low-cost, renewable-integrated energy solutions to enhance
project sustainability and reduce long-term operating costs
Government & Infrastructure Support:
o
Western Australia has committed billions of dollars in funding for rare earth and
critical minerals projects, offering potential grants and incentives for the
development of North Stanmore
o
The state’s well-established mining supply chain, permitting processes, and
infrastructure funding programs provide a fast-tracked pathway to development
With direct access to transport networks, reliable infrastructure, and proven hybrid energy
solutions, North Stanmore is well-positioned to become a cost-effective and scalable producer of
heavy rare earths, scandium and hafnium, further reinforcing Victory Metals' competitive edge in
the global rare earth sector.
Geology
The North Stanmore clay-hosted rare earth element and scandium deposit occurs in in situ regolith
above the North Stanmore alkaline intrusion immediately north of Cue in the northwestern part of
the Yilgarn Craton. Despite having a distinctive bullseye geophysical magnetic signature, the North
Stanmore intrusion had not been identified previously on regional geological map of the Cue area7.
The absence of tectonite fabrics in non-weathered lithologies from ~250m deep diamond cores
drilled by Victory Metals indicate the North Stanmore intrusion is post-tectonic and therefore postArchean in age. The North Stanmore intrusion is interpreted to be associated with an early
Proterozoic plume track (Fiorentini et al., 2020)8 that resulted in alkaline magmatism (carbonatites,
7 Watkins, K.P., Tyler, I.M., Hickman, A.H., 1987. Cue Western Australia, Second Edition sheet SG50- 15 International Index. 36pp.
8 Fiorentini, M.L., O’Neill, C., Giuliani, A., Choi, E., Maas, R., Pirajno, F., Foley, S. 2020. Bushveld superplume drove Proterozoic magmatism and
metallogenesis in Australia. Nature Sci. Repts. 10:19729
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
kimberlites and differentiated ultramafic to intermediate intrusions), extending in a broad belt from
Mt Weld carbonatite near Laverton through Leonora to Cue.
Figure 4: Location of the North Stanmore intrusion within the Yilgarn Craton
The North Stanmore intrusion was emplaced into Archaean gneiss-granitoid-greenstone lithologies
of the Meekatharra-Mount Magnet greenstone belt in the Murchison Province of the Yilgarn Craton.
Other volcano-plutonic greenstone belts in the vicinity include the Warda Warra, Dalgaranga and
Weld Range greenstone belts. The greenstone belts are dominated by metamorphosed mafic
volcanic (tholeiitic and high Mg basalt and komaiites), subordinate felsic volcanics, felsic
volcanoclastic rocks, pelitic and chemical sediments (BIFs and jaspilite). Thermo-tectonism resulted
in development of large-scale fold structures that were subsequently disrupted by faulting.
Two suites of granitoids intrude the gneisses and greenstone belts, a partly foliated and thoroughly
recrystallised suite, and a later post-tectonic suite. The early most voluminous suite, comprises
granitoids that are recrystallised with foliated margins and massive cores, containing large enclaves
of ortho- and para-gneiss. The second suite consists of relatively small, post tectonic intrusions.
Two large Archaean gabbroic intrusions occur south of Cue, Dalgaranga-Mount Farmer gabbroic
complex in the southwest, and the layered Windimurra gabbroic complex in the southeast. They are
differentiated intrusions ranging in composition from pyroxenite to leucogabbro and are tholeiitic
in affinity, unlike the alkaline North Stanmore intrusion.
The North Stanmore intrusion is a large (approximately 16km by 5km) differentiated ultramafic to
felsic intrusion. Lithologies identified in thin section include kaersutite and carbonate-bearing
peridotite, orthopyroxenite, clinopyroxenite, leuco- and leuco-gabbro (ijolite), diorite, monzonite
and syenite. Some regolith samples are strongly LREE enriched indicating that the intrusion also
contains carbonatite. However, the uniformly high HREO/TREO of the regolith (of approximately
34% to 38%) indicates that carbonatite represents a subordinate phase in the intrusion.
The rare earth element mineralisation above the North Stanmore alkaline occurs in a relatively flatlaying saprolite-rich clay horizons beneath a veneer of unconsolidated colluvium that ranges in
thickness from 0–36m.
ACN: 124 279 750 E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
—
T H E
F U T U R E
O F
A U S T R A L I A N
H E A V Y
R A R E
E A R T H S
—
Importantly, geochemical studies have shown that Nb/Ta ratio of regolith over carbonatites and
other alkaline intrusions closely resembles the Nb/Ta ratio of their source plume generated
lithologies9.
The uniformity of Nb/Ta ratios (Nb/Ta 16±4) in the regolith above the North Stanmore intrusion
indicates that the regolith developed in situ above the alkaline intrusion.
REEs are complexed with carbonate ions [CO32-] and bicarbonate ions [HCO3-] or occur as REE3+ ions
in soil as groundwater migrates downwards during tropical weathering. Based on
Ce/Ce*systematics10 .
Ce/Ce* ratios >1 reflect the gain of Ce4+ at shallower regolith depths while Ce/Ce* ratios <1 reflect
the loss of mobile Ce4+ from deeper Ce3+ rich parts of weathering profiles. There appear to be four
zones of REE enrichment at North Stanmore. These zones are 15m to 25m, 28m to 37m, 41m to
46m and a deeper zone between 53m and 77m. QEMSCAN mineralogical studies show that the REEs
are mainly hosted by <20μm particles.
Development and the preservation of such a thick oxidised regolith is quite unique and reflects the
combination of ancient tectonic and palaeoclimatic conditions. Geochronological studies have
shown that intense chemical weathering occurred in Yilgarn/Hamersley region between ~45-55
Ma11. The period was called the Eocene Thermal Maxima.
At this time there was a very small temperature gradient between the equator and the poles and a
hot humid climate existed globally supporting the growth of tropical forests, even at high latitudes12.
The thermal maximum also coincided with a time when there was a 100% increase in intensity of
silicate weathering13.
Continental reconstructions based on paleomagnetic data have shown that during the Eocene
Thermal Maxima, the Yilgarn Craton was located near the south pole. Thus, the very thick regolith
above the North Stanmore intrusion is a very ancient feature that has been preserved because the
Yilgarn Craton is now located in an arid climatic zone where erosion is limited.
REEs mobilised from host minerals (xenotime and monazite) in the North Stanmore intrusion were
likely released by microbes and organic acids14.
The REEs were transported in groundwaters and were precipitated at redox fronts, or they were
concentrated in saprock. They are adsorbed onto kaolinite and halloysite, or formed secondary REE
phosphates, rhabdophane (after monazite), churchite (after xenotime), and floren
Share your feedback
Discover