Victory Metals Limited (ASX:VTM) is pleased to provide an update on the
continued successful operation of its flotation pilot plant in Perth, Western
Australia. The flotation pilot plant continues to deliver heavy rare earth enriched
concentrate under continuous operating conditions at ambient temperatures, and
the Company has now commenced dispatching heavy rare earth mineral
concentrate to potential offtake partners in Australia, Japan and the United States
of America for independent product examination.
HIGHLIGHTS
• Victory’s Perth pilot plant continues to operate successfully, producing heavy
rare earth enriched concentrate under continuous, steady-state conditions.
• Heavy rare earth mineral concentrate is now being dispatched to potential
offtake partners in Australia, Japan and the United States of America for
independent product examination.
• Independent examination and qualification of Victory’s concentrate is a key
commercial step toward securing offtake agreements.
• The concentrate’s premium Dysprosium, Terbium and Yttrium content aligns
directly with the critical needs of Western supply chains.
Victory Metals Chief Executive Officer and Executive Director Brendan Clark
commented: “Our pilot plant has moved from a commissioning milestone to
consistent, reliable operation, and that consistency is exactly what our preferred
offtake partners want to see. Dispatching our heavy rare earth concentrate to
these partners in Australia, Japan and the United States for their own
independent examination is a significant commercial step our product is now
being assessed by the very groups that need it most.”
Pilot Plant Operations and Concentrate Dispatch
Victory’s purpose built flotation pilot plant in Perth, Western Australia has
continued to operate successfully since its commissioning, producing heavy rare
earth enriched concentrate under continuous, steady state conditions consistent
ASX RELEASE 09 JULY 2026
Page 2 of 5
with the results previously reported by the Company.1
Ongoing operation of the
plant continues to de risk the Company’s simple, low cost flotation flowsheet and
provides Victory with direct ownership of its processing knowledge and the ability
to optimise and scale its flowsheet rapidly.
Figure 1. Australian Resource Minister Hon Madeline King pictured with Victory’s CEO & Executive Director
Brendan Clark at the Company’s Perth based Rare Earth flotation pilot plant.
With the flowsheet demonstrated at continuous pilot scale, the Company has now
produced sufficient volumes of its heavy rare earth enriched concentrate to
commence sampling programs with potential offtake partners. Concentrate is
being dispatched to counterparties in Australia, Japan and the United States of
America for independent product examination, analysis and qualification.
Independent examination allows potential offtake partners to verify the
concentrate’s grade, heavy rare earth distribution and low impurity profile in their
own facilities, and is a customary and important step in the qualification of new
supply sources. The Company believes the concentrate’s high heavy rare earth
content, anchored by Dysprosium, Terbium and Yttrium, positions it strongly with
Western partners seeking secure, non Chinese supply of these critical materials.
Victory will continue offtake discussions in parallel with the PFS and looks forward
to updating the market as these programs progress.
1
Refer to ASX Announcement dated 17/06/2026 and titled “VTM COMMISSIONED PILOT PLANT DELIVERS 7.1%
TREO CONCENTRATE”.
Page 3 of 5
Pre-Feasibility Study Update
The Company also provides an update on the Pre-Feasibility Study (PFS) for its
100% owned North Stanmore Project. During pilot plant operations and the
concurrent review of geological data, Victory identified that a substantial volume
of material at North Stanmore previously logged as saprock is, in fact, saprolite.
Saprolite is the ore type on which the Company’s metallurgical test work, including
its flotation and leach programs, as well as current pilot plant operations, has been
based. As a conservative measure, material logged as saprock had previously been
excluded from the PFS mine plan.
The correction of this classification means that a substantial volume of additional
saprolite, including further high-grade domains, is now available for inclusion in
the Ore Reserve PFS. This material is the same ore type that has consistently
delivered the Company’s strong metallurgical results, and its inclusion is expected
to provide additional economic benefits to the Project, including the potential to
support an expanded Ore Reserve.
Figure 2. Plot of Ce/Ce* (a proxy for oxidation) versus depth showing that oxidation in the clay dominated
regolith extended to depths of 80m. This is shown by the variation in Ce/Ce* from <<1 to >>1. Below 80m
the Ce/Ce* is essentially 1 which is typical of unweathered igneous rocks.
Page 4 of 5
Victory Metals Chief Executive Officer and Executive Director Brendan Clark
commented: “The identification that a vast amount of material previously logged
as saprock is in fact saprolite the very material on which every stage of our test
work has been performed is a clear win for the Project. Including it in the PFS ORE
is expected to add further economic advantages, and it makes clear commercial
sense to capture that value now rather than leave it behind.”
“Moving the PFS completion to August 2026 is a value driven decision. A modest
extension to incorporate a larger inventory of proven ore positions the study and
the Project to be materially stronger.”
The Company considers it to be in the best interests of shareholders to capture this
additional value within the current study, rather than defer it to later study phases.
Incorporating the reclassified material requires updates to the geological model
and mine schedule, and will support a positive impact to the Ore Reserve PFS,
which is now scheduled for completion in August 2026. All other PFS workstreams
remain on track.
This announcement has been authorised by the Board of Victory Metals
Limited.
For further information please contact:
Brendan Clark Jim Carden
CEO and Executive Director Investor and Media Relations
admin@victorymetalsaustralia.com jimc@bastionagency.com
Victory Metals Limited
Victory is dedicated to the exploration and development of its flagship North
Stanmore Heavy Rare Earth Elements (HREE), and critical minerals project located
in the Cue Region of Western Australia. The Company is committed to advancing
this world-class project to unlock its significant potential.
In August 2025, Victory Metals announced a robust Mineral Resource Estimate
(MRE) for North Stanmore, totalling 320.6 million tonnes, with most of the resource
classified in the indicated category. This positions the North Stanmore Project as
Australia's largest indicated clay heavy rare earth resource, underscoring its pivotal
role as a future supplier of critical materials.
Page 5 of 5
North Stanmore Mineral Resource Estimate
Table 1: North Stanmore August 2025 MRE (≥330ppm TREO + Sc2O3 cut-off grade)
CLASSIFICATION
MRE
TONNES
(t)
TREOSc
(ppm)
TREO
(ppm)
HREO
(ppm)
LREO
(ppm)
HREO/TREO
(%)
Sc2O3
(ppm)
Ga2O3
(ppm)
INDICATED 176,522,000 532 505 190 316 39 26 26
INFERRED 144,118,000 484 463 166 297 37 21 25
TOTAL 320,640,000 510 486 179 307 38 24 26
Numbers are rounded to reflect they are an estimate. Numbers may not sum due to rounding.
Forward-looking statements
This announcement contains “forward-looking statements”. All statements other
than those of historical facts included in this announcement are forward-looking
statements. Where a company expresses or implies an expectation or belief as to
future events or results, such expectation or belief is expressed in good faith and
believed to have a reasonable basis. However, forward-looking statements are
subject to risks, uncertainties and other factors, which could cause actual results to
differ materially from future results expressed, projected or implied by such forward-
looking statements. Such risks include, but are not limited to, metals price volatility,
currency fluctuations, increased production costs and variances in ore grade or
recovery rates from those assumed in mining plans, as well as political and
operational risks and governmental regulation and judicial outcomes. Victory
undertakes no obligation to release publicly any revisions to any “forward-looking”
statement.
Competent Person Statement - Professor Ken Collerson
Statements contained in this report relating to exploration results, metallurgy
results, scientific evaluation, and potential, are based on information compiled and
evaluated by Emeritus Professor Ken Collerson. Professor Collerson (PhD) Principal
of KDC Geo Consulting and Director of Victory Metals Limited, and a Fellow of the
Australasian Institute of Mining and Metallurgy (AusIMM No. 100125), is a
geochemist/geologist with sufficient relevant experience in relation to rare earth
element and critical metal mineralisation being reported on, to qualify as a
Competent Person as defined in the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (JORC Code 2012). Professor Collerson
consents to the use of this information in this report in the form and context in
which it appears.
Share your feedback
Discover