FOLLOW UP MET TESTWORK PROVIDES EXCELLENT RECOVERIES
Released
Released
Announcement PDF
13 June 2023
FOLLOW UP METALLURGICAL TESTWORK PROVIDES EXCELLENT
RARE EARTH MAGNET METAL RECOVERIES
VICTORY SET TO PRODUCE A MIXED RARE EARTH CARBONATE PRODUCT
•
Follow up metallurgical diagnostic testwork has demonstrated recoveries of Light Rare Earth
Elements (LREE) up to 78% Neodymium (Nd) and 76% Praseodymium (Pr) and Heavy Rare
Earth Elements (HREE) with up to 79% Dysprosium (Dy) and 80% Terbium (Tb)
•
Combined recovery of up to 77.7% of magnet metals NdPr+DyTb
•
Recoveries were achieved by an acid bake leach using low-cost sulphuric acid (H2SO4), 200°C
temperatures and low leach times (2 hrs)
•
The focus of this diagnostic work was to gather further understanding of process conditions
required to increase the recoveries of LREE. The metallurgical test work continued to focus
on extracting valuable and critical HREE Dy+Tb
•
QEMSCAN and metallurgical test results obtained to-date confirm the presence of both
ammonium sulphate leachable ionically clay bonded REEs as well as the presence of
weathering mobilised REE phosphate phases potentially rhabdophane (hydrated monazite)
and churchite (hydrated xenotime) recovered by acid baking
•
This advanced metallurgical program is anticipated to complement the pending initial JORC
Mineral Resource Estimate (MRE)
•
A further a major metallurgical test work program has commenced which includes flow sheet
design to produce a mixed rare earth carbonate (MREC) as the end product
Victory Metals Limited (ASX:VTM) (“Victory” or “the Company”) is pleased to advise it has
received further metallurgical test results using diagnostic test methods on composite drill
samples from the North Stanmore Rare Earth Element Project (North Stanmore or the
Project), located approximately 10km north from the town of Cue, Western Australia and
benefits from direct access to the Great Northern Highway.
The further metallurgical results were received from two composite samples prepared from
12 representative samples collected from across the Project. The results have identified the
process conditions required to produce very high LREE and HREE yields at North Stanmore.
The implications of the diagnostic test results on project yield and economics will be assessed
and incorporated appropriately into the initial JORC MRE which is rapidly progressing. The
MRE will now be reported in early July 2023 to allow for the incorporation of these further
results.
Page 1
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
The Company is also pleased to report the commencement of an advanced metallurgical test
work program by Core Group (Core), a Metallurgical Project Development firm based in
Brisbane Australia providing services covering all aspects of metallurgical testing, process
engineering, flowsheet development and site support services for the global mining industry.
Victory’s Chief Executive Officer and Executive Director Brendan Clark Comments
“These results are outstanding and further demonstrate the excellent process mineralogy from
Victory’s 100% owned North Stanmore rare earth element project in Western Australia.”
“North Stanmore is exhibiting all the important hallmarks of a significant rare earth element
project which includes large scale, high metal recovery, high average grades, logistical and
geopolitical advantages as well as market leading ratios of valuable and critical heavy rare
earth elements including Dysprosium (Dy) and Terbium (Tb).”
“It is a very exciting time for the Company with the rapidly advancing JORC Mineral Resource
Estimate and for the commencement of the advanced metallurgical test work program that is
set to produce our very own Mixed Rare earth carbonate (MREC) product.
Follow Up Metallurgical Testwork
Follow up diagnostic metallurgical testing was undertaken by Core Metallurgy in Brisbane
over May 2023.
Diagnostic leach testwork was carried out on two sample composite blends, VTM002 and
VTM003, produced from 16 representative samples selected from the North Stanmore
project. The samples used to generate composite blends are displayed below in Table 1.
Assays of the composite samples are given in Table 2.
Blend
VTM002
VTM003
Sample
ID
Hole ID
MGA
East
MGA
North
From
m
To
m
308229
308385
308386
308411
308412
308491
310654
312009
308387
308388
308409
310656
310657
310658
312010
312011
NSTAC084
NSTAC097
NSTAC097
NSTAC098
NSTAC098
NSTAC102
NSTAC061
NSTAC319
NSTAC097
NSTAC097
NSTAC098
NSTAC061
NSTAC061
NSTAC061
NSTAC319
NSTAC319
6973903
6973897
6973897
6973883
6973883
6973916
6974952
6971300
6973897
6973897
6973883
6974952
6974952
6974952
6971300
6971300
590186
588899
588899
588797
588797
588413
589600
589600
588899
588899
588797
589600
589600
589600
589600
589600
37
18
19
27
28
58
41
10
20
21
25
43
44
45
11
32
38
19
20
28
29
59
42
11
21
22
26
44
45
46
12
33
Table 1. Drill collar information with depths of samples used to produce the composites.
Page 2
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
Element
Unit
VTM002
Blend
VTM003
Blend
La
Ce
Pr
Nd
Sm
Eu
Gd
Tb
Dy
Ho
Er
Tm
Yb
Lu
Y
Nb
TREY
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
165
155
36
145
32
9
35
6
40
9
27
4
25
4
278
7
968
76
105
16
66
17
5
24
5
30
7
22
3
19
3
229
8
627
HREE¹
ppm
435
348
LREE²
ppm
533
279
1 - Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu plus Y
2 - La, Ce, Pr, Nd and Sm
Table 2. Head grade of Composite Samples used in Diagnostic Testing
The objective of the successful initial metallurgical testwork program was to establish a set of
typical REE clay leach parameters whilst this follow up program was to further understand
REE mineralisation through diagnostic leach tests representative of alternative processing
technologies. Results of diagnostic leaching via acid bake and caustic cracking technologies
on composite samples are displayed below in Figure 1 and 2.
Figure 1: Extraction of Rare Earth Elements from Composites VTM002 and VTM003 (200°C Acid Bake, 2-hour, 300 kg/t H2SO4 addition
followed with 2-hour water leach at 25% w/w solids and ambient temperature)
Page 3
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
Figure 2: Extraction of Rare Earth Elements from Composites VTM002 and VTM003 (140°C Caustic Cracking with 70% w/w NaOH, 2hour, followed with 2-hour pH 3 HCl leach at 25% w/w solids and ambient temperature)
Acid Bake Leach Process
The sulphuric acid bake has historically been, and is also currently, one of the major processes
used for chemical decomposition of REE ore minerals, such as Monazite, to release contained
REE. Current sulphuric acid bake processes utilised for the Bayan Obo deposit in China and
the Mt. Weld deposit in Australia, together account for more than half of the world's rare
earth production1. In the sulphuric acid bake, the rare earth elements are converted to rare
earth sulphates which are dissolved in a subsequent water leach. The conditions required to
achieve mineral decomposition vary widely for different rare earth minerals. Typically, the
sulphuric acid bake step may utilise elevated temperature of approximately 200°C to 800°C
with a 1-to-4-hour residence time and an upfront addition of concentrated sulphuric acid. The
REE elements are then released from the mineral phase and available to solubilise in the
subsequent water leach step.
Caustic Cracking Process
The caustic (or alkaline) cracking process is an alternative to the sulphuric acid bake and is
preferred for processing of high-grade monazite sands1. The caustic cracking process
decomposes the REE minerals to produce REE hydroxides which are insoluble. The REE
hydroxides are then solubilised in a subsequent weak acid leach. Typically, the caustic
cracking step may utilise elevated temperature of approximately 120°C to 150°C and sodium
hydroxide concentration of 50% to 70% w/w, with a 1-to-4-hour residence time2. The REE
elements are then solubilised in a weak acid leach at pH 3-4 using an inorganic acid.
1 Demol, J., Ho, E., Soldenhoff, K., Senanayake, G. (2019). The sulfuric acid bake and leach route for processing of rare earth ores and
concentrates: A review. Hydrometallurgy, 188, 123-139. https://doi.org/10.1016/j.hydromet.2019.05.015
2 Sadri, F., Nazari, A.M., Ghahreman, A. (2017). A review on the cracking, baking and leaching processes.
Page 4
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
Advanced Metallurgical Program
Following on from scoping level testwork at North Stanmore and recent diagnostic testwork,
Victory has commenced a follow up advanced test work program with Core. Core proposes
to further develop the typical REE metallurgical flowsheet (Figure 3) by carrying out extensive
testwork across each flowsheet step. Core will be considering the results from the recent
diagnostic tests to further develop test conditions aiming to lift the recovery while also
considering future capital and operating cost requirements.
Figure 3: General proposed flowsheet for REE Clay Processing
Victory have provided 31 AC Drill samples, aligned with the JORC resource modelling, for
metallurgical testwork, which are displayed below in Table 3. Head grades of the provided
samples range from 902 ppm to 10498 ppm TREYO.
Page 5
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
Sample ID
Hole ID
314382
314585
314586
314625
314624
314623
314659
314767
314842
314841
314984
314089
314086
314085
314011
313992
314255
314254
314257
308412
308413
308408
308410
308409
308406
313268
313267
313269
313270
313271
313273
NSTRC030
NSTRC040
NSTRC040
NSTRC044
NSTRC044
NSTRC044
NSTRC046
NSTRC053
NSTRC056
NSTRC056
NSTRC056
NSTRC063
NSTRC063
NSTRC063
NSTRC070
NSTRC071
NSTRC076
NSTRC076
NSTRC076
NSTAC098
NSTAC098
NSTAC098
NSTAC098
NSTAC098
NSTAC098
NSTAC170
NSTAC170
NSTAC170
NSTAC170
NSTAC170
NSTAC170
From
m
33
30
31
20
19
18
28
53
76
75
65
49
46
45
33
38
35
34
37
28
29
24
26
25
22
29
28
30
31
32
34
To
m
34
31
32
21
20
19
29
54
77
76
66
50
47
46
34
39
36
35
38
29
30
25
27
26
23
30
29
31
32
33
35
TREYO
ppm
1386
1064
903
1589
1561
1308
1893
1177
913
1136
1009
1431
926
902
1174
10498
994
3492
1131
1253
1436
1623
1013
1613
1013
2497
1255
1444
1034
1111
1033
HREYO¹
ppm
391
541
492
787
346
244
894
465
437
553
101
550
242
274
670
5950
482
1886
530
468
485
646
523
798
192
954
282
598
294
411
486
Sc₂O₃
ppm
17
35
29
34
28
29
12
31
22
21
25
15
46
48
14
21
15
20
17
23
29
21
23
23
14
18
17
25
17
20
26
1 - Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu plus Y]
Oxides
Table 3. Drill Samples Provided for Metallurgical Testing
Follow up testwork includes:
•
•
•
•
•
Sample blending and compositing to generate sample composites representing
various geometallurgical domains
REE clay leach optimisation on sample composites
Variability diagnostic leach tests on individual drill samples using optimised leach
conditions
Sighter impurity removal testwork
Produce mixed rare earth carbonate
A summary schedule for the testwork program is provided below in Figure 4, with initial
upgrading size by assay results expected in early July.
Page 6
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
Figure 4: Test Program Schedule
Mineral Characterisation using QEMSCAN
QEMSCAN® (quantitative evaluation of minerals by scanning electron microscopy), couples
scanning electron microscopy (SEM) and energy dispersive X-ray spectrometry to
automatically produce images showing the particle size distribution of mineral phases. A
QEMSCAN study of regolith ores from North Stanmore with variable Ce/Ce* anomalies3 was
undertaken by the JKMRC at the University of Queensland to assist in designing processes for
beneficiating the ore. Ce/Ce* of <1 indicate that Ce has undergone partial oxidation of Ce3+
to Ce4+. Ce4+ is mobile under oxidising and migrates to higher levels of the weathering profile.
The presence of Ce/Ce* anomalies of <1 supports the interpretation regarding the presence
of rhabdophane (hydrated monazite) and churchite (hydrated xenotime) in the North
Stanmore regolith.
Figure 5 shows MLA images from two samples with Ce/Ce* anomalies of 0.21 and 0.68
respectively. The principal REE phases are < 15 microns in diameter. Thus, it is anticipated
that REE phases will be amenable to beneficiation. This will have positive implications for REE
recovery and gangue separation.
3
Ce/Ce* = (2*(CeN)/(LaN+PrN) where CeN, LaN and PrN are chondrite normalised values
Page 7
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
Figure 5: QEMSCAN images showing size distributions of REE phases in two samples from North Stanmore. Note scale bar is 100
microns in length.
Page 8
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
This announcement has been authorised by the Board of Victory Metals Limited.
For further information please contact:
Brendan Clark
CEO and Executive Director
b.clark@victorymetalsaustralia.com
Lexi O’Halloran
Investor and Media Relations
lexi@janemorganmanagement.com.au
Victory Metals Limited: Company Profile
Victory is focused upon the exploration and development of its Rare Earth Element (REE) and
Scandium Discovery in the Cue Region of Western Australia. Victory’s key assets include a
portfolio of assets located in the Midwest region of Western Australia, approximately 665 km
from Perth. Victory’s Ionic clay REE discovery is rapidly evolving with the system demonstrating
high ratios of Heavy Rare Earth Oxides and Critical Magnet Metals NdPr + DyTb.
Competent Person Statement
Professor Ken Collerson
Statements contained in this report relating to exploration results, scientific evaluation, and
potential, are based on information compiled and evaluated by Professor Ken Collerson.
Professor Collerson (PhD) Principal of KDC Geo Consulting, and a Fellow of the Australasian
Institute of Mining and Metallurgy (AusIMM), is a geochemist/geologist with sufficient
relevant experience in relation to rare earth element geochemistry, critical metal
mineralisation and REE systematics given in Core metallurgical data summaries that are being
reported on, to qualify as a Competent Person as defined in the Australian Code for Reporting
of Identified Mineral resources and Ore reserves (JORC Code 2012). Professor Collerson
consents to the use of this information in this report in the form and context in which it
appears.
The Company confirms that it is not aware of any new information or data that materially
affects the information included in the original market announcements in relation to the
exploration results. The Company confirms that the form and context in which the competent
persons findings have not been materially modified from the original announcement.
Page 9
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
Figure 6. Regional Map showing Victory Metals tenement package and pending tenements.
Page 10
“THE FUTURE OF AUSTRALIAN RARE EARTHS”
ACN: 124 279 750
E: info@victorymetalsaustralia.com D: +61 (08) 6555 2950 A: Suite 1, 295 Rokeby Road, Subiaco, WA, 6008
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
•
•
Drilling techniques
Drill sample
recovery
Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc). These
examples should not be taken as
limiting the broad meaning of
sampling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
•
Aspects of the determination of
mineralisation that are Material to
the Public Report.
•
In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information.
•
•
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
•
Victory Metals Australia (ASX:VTM) completed three aircore
drilling campaigns at North Stanmore during the period MayDecember 2022.
Aircore (AC) drilling samples were collected as 1-m samples
from the rig cyclone and placed on top of black plastic that
was laid on the natural ground surface to prevent
contamination in separate piles and in orderly rows.
•
Using a hand-held trowel, 4m composite samples were
collected from the one-meter piles.
•
These composite samples weighed between 2 and 3 kgms.
•
A handheld pXRF analyzer (Olympus Vanta) was used to
determine anomalous REE (Rare earth element) geochemistry
from the on ground 1-m sample piles.
•
pXRF reading times were 45 secs over 3 cycles for
multielement and REE assays.
•
These results are not considered reliable without calibration
using chemical analysis from an accredited laboratory.
•
The pXRF is used as a guide to the relative presence or
absence of certain elements, including REEs to help direct the
sampling program.
•
Anomalous Samples were collected using a handheld trowel
and placed into calico bag weighing 2-3 kgms, ready for
transporting to the assay lab for analysis.
•
REE anomalism thresholds are determined by Victory Metals
geologists based on historical data analysis.
•
Air core drilling uses a three-bladed steel or tungsten drill bit
to penetrate the weathered layer of loose soil and rock
fragments. The drill rods are hollow and feature an inner
tube with an outer barrel (similar to RC drilling).
•
Air core drilling uses small compressors (750 cfm/250 psi) to
drill holes into the weathered layer of loose soil and
fragments of rock.
•
After drilling is complete, an injection of compressed air is
unleashed into the space between the inner tube and the
drill rod’s inside wall, which flushes the cuttings up and out of
the drill hole through the rod’s inner tube, causing Less
chance of cross-contamination.
•
Air core drill rigs are lighter in weight than other rigs,
meaning they’re quicker and more maneuverable in the
bush.
•
AC Drilling was performed by Seismic Drilling of Wangara and
Orlando Drilling from Perth.
•
Representative air core samples collected as 2-meter
intervals, with corresponding chips placed into chip trays and
kept for reference at VTM’s facilities.
•
Most samples were dry and sample recovery was very good.
Criteria
Logging
JORC Code explanation
Commentary
•
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
•
VTM does not anticipate any sample bias from loss/gain of
material from the cyclone.
•
•
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse grained material.
No defined relationship exists between sample recovery and
grade. Sample bias due to preferential loss or gain of fine or
coarse material has not been noted.
•
VTM does not anticipate any sample bias from loss/gain of
material from the cyclone.
•
All aircore samples were lithological logged using standard
industry logging software on a notebook computer.
All AC samples have been logged for lithology, alteration, quartz
veins, colour, fabrics.
Representative AC samples collected as 2-meter intervals,
with corresponding chips placed into chip trays and kept for
reference at VTM’s facilities.
•
•
Sub-sampling
techniques and
sample
preparation
Quality of assay
data and
laboratory tests
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
•
•
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
•
Logging is qualitative in nature.
•
Samples have not been photographed.
•
The total length and percentage of
the relevant intersections logged.
•
All geological information noted above has been completed
by a competent person as recognized by JORC.
•
If core, whether cut or sawn and
whether quarter, half or all core
taken.
•
Air core sampling was undertaken on 1m intervals using a
Meztke Static Cone splitter.
•
Most 1-meter samples were dry and weighed between 2 and
3 kgms.
•
Samples from the cyclone were laid out in orderly rows on
the ground.
•
Using a hand-held trowel, 4m composite samples were
collected from the one-meter piles.
•
These composite samples weighed between 2 and 3 kgms.
•
For any anomalous (>0.1 g/t Au) 4m composite sample
assays, the corresponding one-meter samples are also
collected and assayed.
•
Quality control of the assaying comprised the collection of a
duplicate sample every hole, along with the regular insertion
of industry (OREAS) standards (certified reference material)
every 30 samples and blanks (beach sand) every 50 samples.
•
Samples to be submitted for sample preparation and
geochemical analysis by ALS Perth.
In the field spot checks were completed on selected samples
using a hand held Olympus Vanta XRF unit. These results are
not considered reliable without calibration using chemical
analysis. They were used as a guide to the relative presence
or absence of certain elements, including REEs to help guide
the drill program.
•
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
•
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
•
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
•
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance results for field
duplicate/second-half sampling.
•
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
•
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
•
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times,
calibrations factors applied and their
derivation, etc.
•
Criteria
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
Orientation of
data in relation to
geological
structure
JORC Code explanation
•
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and
precision have been established.
•
The verification of significant
intersections by either independent or
alternative company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
•
•
•
No verification of significant intersections undertaken by
independent personnel, only the VTM project geologist.
•
Validation of 4m composite assay data was undertaken to
compare duplicate assays, standard assays and blank assays.
•
Comparison of assaying between the composite samples
(aqua regia digest) and the 1-meter samples (4 acid digest)
will be made.
•
ALS labs routinely re-assayed anomalous assays (greater than
0.3 g/t Au) as part of their normal QAQC procedures.
•
All aircore drill hole coordinates are in GDA94 Zone 50
•
All aircore holes were located by handheld GPS with an
accuracy of +/- 5 m.
•
There is no detailed documentation regarding the accuracy of
the topographic control.
•
No elevation values (Z) were recorded for collars. An
elevation of 450 mRL was assigned by VTM.
•
There were no Down-hole surveys completed as aircore drill
holes were not drilled deep enough to warrant downhole
surveying.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic
control.
•
Data spacing for reporting of
Exploration Results.
•
Aircore drilling at Stanmore and Mafeking Bore was on 100
metre line spacing and 900 metres between drill holes.
•
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
•
Given the first pass nature of the exploration programs, the
spacing of the exploration drilling is appropriate for
understanding the exploration potential and the
identification of structural controls on the mineralisation.
•
Four- meter sample compositing has been applied.
•
The relationship between drill orientation and the
mineralised structures is not known at this stage as the
prospects are covered by a 2-10m blanket of transported
cover.
•
It is concluded from aerial magnetics that any mineralisation
trends 010-030. Dips are unknown as the area is covered by a
thin (1-5m) blanket of transported cover.
•
Azimuths and dips of aircore drilling was aimed to intersect
the strike of the rocks at right angles.
•
Downhole widths of mineralisation are not accurately known
with aircore drilling methods.
•
All samples packaged and managed by VTM personnel
•
Whether sample compositing has
been applied.
•
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
•
Sample security
Commentary
•
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
Criteria
Audits or reviews
JORC Code explanation
•
The results of any audits or reviews of
sampling techniques and data.
Commentary
•
Larger packages of samples will be couriered to ALS from Cue
by professional transport companies in sealed bulka bags.
•
No sampling techniques or data have been independently
audited.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
•
•
North Stanmore is located within E 20/871.
•
They form part of a broader tenement package of exploration
tenements located in the Cue Goldfields in the Murchison
region of Western Australia.
•
Native Title claim no. WC2004/010 (Wajarri Yamatji #1) was
registered by the Yaatji Marlpa Aboriginal Corp in 2004 and
covers the entire project area, including Coodardy and Emily
Wells.
•
E20/871 is held 100% by Victory Metals. All tenements are
secured by the DMIRS (WA Government). All tenements are
granted, in a state of good standing and have no
impediments.
•
The area has been previously explored by Harmony Gold
(2007-2010) in JV with Big Bell Ops, Mt Kersey (1994-1996)
and Westgold (2011) and Metals Ex (2013).
•
Harmony Gold intersected 3m @ 2.5 g/t Au and 2m @ 8.85
g/t Au in the Mafeking Bore area but did not follow up these
intersections.
•
Other historical drill holes in the area commonly intersected
> 100 ppb Au.
•
Exploration by these companies has been piecemeal and not
regionally systematic.
•
There has been no historical exploration for REEs in the
tenement.
•
Both areas, lie within the Meekatharra – Mount Magnet
greenstone belt. The belt comprises metamorphosed
volcanic, sedimentary and intrusive rocks. Mafic and
ultramafic sills are abundant in all areas of the Cue
greenstones. Gabbro sills are often differentiated and have
pyroxenitic and/or peridotite bases and leucogabbro tops.
•
The greenstones are deformed by large scale fold structures
which are dissected by major faults and shear zones which
can be mineralised. Two large suites of granitoids intrude the
greenstone belts.
•
The productive gold deposits in the region can be classified
into six categories:
•
Shear zones and/or quartz veins within units of alternating
banded iron formation and mafic volcanics e.g. Tuckanarra.
Break of Day.
•
Shear zones and/or quartz veins within mafic or ultramafic
rocks, locally intruded by felsic porphyry e.g., Cuddingwarra.
Great Fingall.
•
Banded jaspilite and associated clastic sedimentary rocks and
mafics, generally sheared and veined by quartz, e.g.
Tuckabianna.
•
Quartz veins in
Share your feedback
Discover